700 University Ave, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 700 University Ave, Toronto was permitted on September 3, 2025 with a stated construction value of $10M to $25M. Interior alterations of existing premises to existing group d occupancy Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 700 University Ave, Toronto |
| Neighbourhood | Kensington-Chinatown |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 3, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Interior alterations of existing premises to existing group d occupancy”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 399 Bathurst St: Healthcare Building
- 10 Tempo Ave: Office and Tenant Fit-Out
- 6 Spadina Rd: Transit Facility Renovation
- 2075 Bayview Ave: Healthcare Building Renovation
- 7 Wardlaw Cres: Affordable Housing
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 700 University Ave?
Office and Tenant Fit-Out. Interior alterations of existing premises to existing group d occupancy
When was the permit issued for 700 University Ave?
September 3, 2025, by the City of Toronto.
Who is building 700 University Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 700 University Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.