10 Tempo Ave, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 10 Tempo Ave, Toronto was permitted on August 25, 2025 with a stated construction value of $10M to $25M. Proposal for an interior alteration to a spa with site alterations to provide all new parking spaces and loading spaces Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 10 Tempo Ave, Toronto |
| Neighbourhood | Hillcrest Village |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | August 25, 2025 |
| Stated construction value | $10M to $25M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for an interior alteration to a spa with site alterations to provide all new parking spaces and loading spaces”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 700 University Ave: Office and Tenant Fit-Out
- 6 Spadina Rd: Transit Facility Renovation
- 2075 Bayview Ave: Healthcare Building Renovation
- 7 Wardlaw Cres: Affordable Housing
- 10 R Ordnance St: Transit Facility
All of them: major construction projects in Toronto. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 10 Tempo Ave?
Office and Tenant Fit-Out. Proposal for an interior alteration to a spa with site alterations to provide all new parking spaces and loading spaces
When was the permit issued for 10 Tempo Ave?
August 25, 2025, by the City of Toronto.
Who is building 10 Tempo Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 10 Tempo Ave need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
