Data Centre Renovation at 3125 Steeles Ave E, Toronto was permitted on November 18, 2025 with a stated construction value of $1M to $5M. Proposed design and construction of office interiors in a data centre building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3125 Steeles Ave E, Toronto |
| Neighbourhood | Hillcrest Village |
| Project | Data Centre Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | November 18, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposed design and construction of office interiors in a data centre building”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1510 Finch Ave E: Office and Tenant Fit-Out
- 1700 Finch Ave E: Apartment Building Renovation
- 3640 Victoria Park Ave: Office and Tenant Fit-Out
- 46 Cresthaven Dr: School Renovation
- 10 Tempo Ave: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3125 Steeles Ave E?
Data Centre Renovation. Proposed design and construction of office interiors in a data centre building
When was the permit issued for 3125 Steeles Ave E?
November 18, 2025, by the City of Toronto.
Who is building 3125 Steeles Ave E?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3125 Steeles Ave E need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.