Commercial Renovation Permits in Red Deer: 96 Permits in Twelve Months

Commercial building under construction with a tower crane
Figures read October 9, 2026 from Builtie's permit data.

The City of Red Deer issued 96 permits for tenant fit-outs, interior alterations and upgrades to existing commercial space from October 2025 to September 2026, 29 of them in the quarter to September. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many commercial renovation permits Red Deer issued

MeasureRed Deer
Permits issued, October 2025 to September 202696
July to September 202629
April to June 202631
Share of Red Deer's classified permits16%
Busiest monthApril 2026 (12)
Rank among 22 markets16 of 22

This counts permits for tenant fit-outs, interior alterations and upgrades to existing commercial space that Builtie classifies as commercial renovation. The quarter to September was down 6% on the quarter before.

Commercial Renovation Permits in Red Deer, by month Oct 2025 4 Nov 2025 7 Dec 2025 3 Jan 2026 9 Feb 2026 6 Mar 2026 7 Apr 2026 12 May 2026 11 Jun 2026 8 Jul 2026 11 Aug 2026 7 Sep 2026 11

Permits issued per month, read October 9, 2026 from Builtie's permit data.

Commercial Renovation Permits: permits in twelve months, by market Miami-Dade 12,251 Austin 7,196 New York City 4,169 Los Angeles 3,793 Calgary 1,737 Chicago 1,728 Vancouver 1,177 Nashville 1,102 Seattle 907 Red Deer 96

The largest markets for commercial renovation, read October 9, 2026.

Who decides on commercial renovation in Red Deer

The tenant or landlord decides, usually through a general contractor or interior contractor that specialises in fit-outs; a designer often specifies the finishes.

Trades these projects buy, and how many are open now

Each trade is bought at its own stage of the build. These are the trades commercial renovation projects lean on, with the projects in Red Deer still inside each trade's award window today:

TradeProjects in its award window nowAward window
Drywall2935% to 60%
Electrical4220% to 45%
HVAC and Mechanical4220% to 45%
Fire Protection1325% to 50%
Low Voltage and Data2235% to 60%
Flooring2950% to 70%
Painting405% to 35%
Finish Carpentry2755% to 75%
Signage and Wayfinding1525% to 70%

What the Red Deer data covers

The data is Red Deer's own building permits. Neighbouring cities issue their own permits and are not in this count. It is a small feed, so a trade's count can change quickly.

Other building types in Red Deer: new residential construction, residential renovation.

Month by month: Red Deer construction permits by month. Every trade: Red Deer construction leads by trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

How many commercial renovation permits were issued in Red Deer in the last year?

96 from October 2025 to September 2026, 29 of them from July to September 2026, read October 9, 2026.

Who awards the trades on commercial renovation projects?

The tenant or landlord decides, usually through a general contractor or interior contractor that specialises in fit-outs; a designer often specifies the finishes.

How do I find commercial renovation projects in Red Deer before they are awarded?

Work from the building permits: Builtie reads the City of Red Deer's permits, estimates each project's stage and shows the ones still inside your trade's award window, with the builder or general contractor and a verified decision maker.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.