Drywall Construction Leads in Fort Worth (2026): 396 Projects in the Award Window

To find drywall construction leads in Fort Worth, work from building permits and time the call to the build stage. On October 9, 2026, 396 permitted projects in the City of Fort Worth were still at the point where drywall is awarded. The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many drywall projects are open in Fort Worth right now
| Measure | Fort Worth |
|---|---|
| Projects in the drywall award window | 396 |
| New buildings / renovations and alterations | 365 / 31 |
| Permitted in the last 90 days | 63 |
| Rank among 25 markets for drywall | 12 of 25 |
| Newest permit in the Fort Worth feed | October 7, 2026 |
92% of them are new buildings and 8% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. 63 of them (16%) were permitted in the last 90 days. Fort Worth ranks 12 of 25 markets Builtie covers for drywall, behind San Antonio (522 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when drywall is awarded, and the job is big enough to be worth quoting: at least $5k of drywall work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Fort Worth.
When drywall is awarded, and who decides
Builtie times drywall from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence.
Tap a stage. The highlighted stage is where drywall is typically awarded.
What to lead with when you call a builder in Fort Worth: crew size, board and taping turnaround, fire-rated assemblies and how you handle the inspection sequence.
What the Fort Worth data covers
The data is Fort Worth's own building permits. Neighbouring cities issue their own permits and are not in this count. Arlington, Dallas and the rest of the Dallas-Fort Worth area are separate permit offices. Builtie looks up the owner company and its contacts behind Fort Worth permits rather than reading a builder off the permit.
If you work from Keller, Benbrook, Haltom City and the rest of Tarrant County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in Fort Worth
| Trade | Projects in the award window | Award window |
|---|---|---|
| Low Voltage and Data leads in Fort Worth | 375 | 35% to 60% |
| Signage and Wayfinding leads in Fort Worth | 413 | 25% to 70% |
| Insulation leads in Fort Worth | 357 | 30% to 55% |
| Tile leads in Fort Worth | 313 | 45% to 65% |
| Fire Protection leads in Fort Worth | 336 | 25% to 50% |
| Cabinetry and Millwork leads in Fort Worth | 309 | 50% to 70% |
Every trade in Fort Worth: Fort Worth construction leads by trade. Every market for drywall: Drywall construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find drywall construction leads in Fort Worth?
Start from building permits, not bid boards: most private drywall work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Fort Worth's permits, keeps the projects still inside the drywall award window (396 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should drywall contractors contact a builder in Fort Worth?
Builtie times drywall from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards drywall work on new construction in Fort Worth?
The builder or general contractor awards drywall once the mechanical rough-ins are scheduled, usually to crews that can hold a tight board-and-tape sequence.
How many drywall projects does Builtie track in Fort Worth?
396 projects were inside the drywall award window on October 9, 2026: 365 new buildings and 31 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
