Low Voltage and Data Construction Leads in Fort Worth (2026): 375 Projects in the Award Window

Sparks flying from metal work on a building under construction
Live figures read October 9, 2026. Builtie construction intelligence content.

To find low-voltage construction leads in Fort Worth, work from building permits and time the call to the build stage. On October 9, 2026, 375 permitted projects in the City of Fort Worth were still at the point where low-voltage is awarded. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many low-voltage projects are open in Fort Worth right now

MeasureFort Worth
Projects in the low-voltage award window375
New buildings / renovations and alterations345 / 30
Permitted in the last 90 days47
Rank among 25 markets for low-voltage12 of 25
Newest permit in the Fort Worth feedOctober 7, 2026

92% of them are new buildings and 8% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. 47 of them (13%) were permitted in the last 90 days. Fort Worth ranks 12 of 25 markets Builtie covers for low-voltage, behind San Antonio (517 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when low-voltage is awarded, and the job is big enough to be worth quoting: at least $4k of low-voltage work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Low Voltage and Data: projects in the award window, by market New York City 19,986 Austin 8,354 Miami-Dade 4,199 Los Angeles 2,367 Calgary 2,317 Toronto 1,502 Nashville 1,288 Chicago 1,091 Seattle 674 Vancouver 650 Fort Worth 375

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Fort Worth.

When low-voltage is awarded, and who decides

Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.

Tap a stage. The highlighted stage is where low-voltage is typically awarded.

What to lead with when you call a builder in Fort Worth: structured cabling, security and access-control integration, and coordination with the electrical rough-in.

What the Fort Worth data covers

The data is Fort Worth's own building permits. Neighbouring cities issue their own permits and are not in this count. Arlington, Dallas and the rest of the Dallas-Fort Worth area are separate permit offices. Builtie looks up the owner company and its contacts behind Fort Worth permits rather than reading a builder off the permit.

If you work from Keller, Benbrook, Haltom City and the rest of Tarrant County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in Fort Worth

TradeProjects in the award windowAward window
Drywall leads in Fort Worth39635% to 60%
Signage and Wayfinding leads in Fort Worth41325% to 70%
Insulation leads in Fort Worth35730% to 55%
Tile leads in Fort Worth31345% to 65%
Fire Protection leads in Fort Worth33625% to 50%
Cabinetry and Millwork leads in Fort Worth30950% to 70%

Every trade in Fort Worth: Fort Worth construction leads by trade. Every market for low-voltage: Low Voltage and Data construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find low-voltage construction leads in Fort Worth?

Start from building permits, not bid boards: most private low-voltage work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Fort Worth's permits, keeps the projects still inside the low-voltage award window (375 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should low-voltage and data contractors contact a builder in Fort Worth?

Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards low-voltage work on new construction in Fort Worth?

The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.

How many low-voltage projects does Builtie track in Fort Worth?

375 projects were inside the low-voltage award window on October 9, 2026: 345 new buildings and 30 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.