Elevators Construction Leads by City (2026): 16,356 Projects in 25 Markets

Glazing crew installing curtain wall panels on a commercial building
Live figures read October 9, 2026. Builtie construction intelligence content.

On October 9, 2026, Builtie counted 16,356 elevator projects still inside the elevator award window across 25 markets in the United States and Canada. New York City leads with 8,863. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open elevator projects in every market Builtie covers

MarketState or provinceProjects in the award windowPermitted in the last 90 days
New York CityNew York8,8638,358
AustinTexas4,4504,326
Miami-DadeFlorida984574
Los AngelesCalifornia698654
ChicagoIllinois210131
TorontoOntario208153
CalgaryAlberta208160
San AntonioTexas188108
VancouverBritish Columbia11656
Fort WorthTexas10043
NashvilleTennessee9352
SeattleWashington4019
TulsaOklahoma3818
North Little RockArkansas3634
KitchenerOntario2513
Thunder BayOntario1811
St. LouisMissouri17
Broken ArrowOklahoma115
Little RockArkansas102
AirdrieAlberta104
Fayetteville, ArkansasArkansas94
Overland ParkKansas93
Windsor, OntarioOntario91
Grande PrairieAlberta52
Red DeerAlberta10

Across the 25 markets, 16,356 elevator projects were inside the award window on October 9, 2026: 15,756 in the United States and 600 in Canada, 14,748 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.

Elevators: projects in the award window, by market New York City 8,863 Austin 4,450 Miami-Dade 984 Los Angeles 698 Chicago 210 Toronto 208 Calgary 208 San Antonio 188 Vancouver 116 Fort Worth 100 Nashville 93 Seattle 40

The twelve largest of 25 markets, read October 9, 2026.

When elevator is awarded, and who decides

Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.

Tap a stage. The highlighted stage is where elevator is typically awarded.

What to lead with: cab and machine specifications, manufacturing lead time and the maintenance contract that follows the install.

Running the pipeline

Elevators work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the specification stage, the consultant who wrote it and the date the shaft is ready in the record. CRM for elevator contractors covers what to look for in a CRM built around that.

More: construction leads for subcontractors, and every market and trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

Where are the most elevator construction leads in North America?

Among the markets Builtie covers, on October 9, 2026: New York City, 8,863 projects; Austin, 4,450 projects; Miami-Dade, 984 projects; Los Angeles, 698 projects; Chicago, 210 projects.

When should elevator contractors contact builders?

Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%.

Who decides on elevator for a new building?

The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.

How are these elevator projects counted?

A project counts when its permit was issued in the last four years, the build is still inside the elevator award window and the job is at least $60k of elevator work. Trade sub-permits are grouped into their parent project.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.