Elevators Construction Leads in Tulsa (2026): 38 Projects in the Award Window

To find elevator construction leads in Tulsa, work from building permits and time the call to the build stage. On October 9, 2026, 38 permitted projects in the City of Tulsa were still at the point where elevator is awarded. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many elevator projects are open in Tulsa right now
| Measure | Tulsa |
|---|---|
| Projects in the elevator award window | 38 |
| New buildings / renovations and alterations | 15 / 23 |
| Permitted in the last 90 days | 18 |
| Rank among 25 markets for elevator | 13 of 25 |
| Newest permit in the Tulsa feed | October 8, 2026 |
39% of them are new buildings and 61% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. Because elevator is bought early, the 18 projects permitted in the last 90 days are the ones to call first; 47% of the count is that recent. Tulsa ranks 13 of 25 markets Builtie covers for elevator, behind Seattle (40 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when elevator is awarded, and the job is big enough to be worth quoting: at least $60k of elevator work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Tulsa.
When elevator is awarded, and who decides
Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.
Tap a stage. The highlighted stage is where elevator is typically awarded.
What to lead with when you call a builder in Tulsa: cab and machine specifications, manufacturing lead time and the maintenance contract that follows the install.
What the Tulsa data covers
The data is Tulsa's own building permits. Neighbouring cities issue their own permits and are not in this count. Broken Arrow, Tulsa's largest neighbour, has its own feed and its own pages.
If you work from Bixby, Jenks, Owasso and Sand Springs, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in Tulsa
| Trade | Projects in the award window | Award window |
|---|---|---|
| Framing leads in Tulsa | 101 | 0% to 20% |
| Structural Steel leads in Tulsa | 100 | 0% to 15% |
| Construction Site Security leads in Tulsa | 38 | Before the start to 15% |
| Concrete and Foundation leads in Tulsa | 65 | Before the start to 5% |
| Masonry leads in Tulsa | 160 | 10% to 30% |
| Painting leads in Tulsa | 214 | 5% to 35% |
Every trade in Tulsa: Tulsa construction leads by trade. Every market for elevator: Elevators construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find elevator construction leads in Tulsa?
Start from building permits, not bid boards: most private elevator work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Tulsa's permits, keeps the projects still inside the elevator award window (38 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should elevator contractors contact a builder in Tulsa?
Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards elevator work on new construction in Tulsa?
The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.
How many elevator projects does Builtie track in Tulsa?
38 projects were inside the elevator award window on October 9, 2026: 15 new buildings and 23 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
