Framing Construction Leads in Tulsa (2026): 101 Projects in the Award Window

Carpenters framing the wood structure of a new house
Live figures read October 9, 2026. Builtie construction intelligence content.

To find framing construction leads in Tulsa, work from building permits and time the call to the build stage. On October 9, 2026, 101 permitted projects in the City of Tulsa were still at the point where framing is awarded. The builder or general contractor books framing crews while the foundation is going in, often from a short list of crews it already trusts. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many framing projects are open in Tulsa right now

MeasureTulsa
Projects in the framing award window101
New buildings / renovations and alterations25 / 76
Permitted in the last 90 days68
Rank among 25 markets for framing14 of 25
Newest permit in the Tulsa feedOctober 8, 2026

25% of them are new buildings and 75% are renovations, additions or alterations, so most of it sits in renovations and fit-outs, where the owner, a designer or a renovation contractor often makes the call. Because framing is bought early, the 68 projects permitted in the last 90 days are the ones to call first; 67% of the count is that recent. Tulsa ranks 14 of 25 markets Builtie covers for framing, behind Kitchener (136 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when framing is awarded, and the job is big enough to be worth quoting: at least $15k of framing work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Framing: projects in the award window, by market New York City 13,097 Austin 4,538 Miami-Dade 2,535 Calgary 1,314 Los Angeles 1,081 Nashville 950 Chicago 785 Toronto 474 Seattle 411 Vancouver 410 Tulsa 101

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Tulsa.

When framing is awarded, and who decides

Builtie times framing from the start of construction to about 20%, with the last realistic approach at about 30%. The builder or general contractor books framing crews while the foundation is going in, often from a short list of crews it already trusts.

Tap a stage. The highlighted stage is where framing is typically awarded.

What to lead with when you call a builder in Tulsa: crew availability for the exact weeks the foundation will be ready, lumber sourcing and your safety record.

What the Tulsa data covers

The data is Tulsa's own building permits. Neighbouring cities issue their own permits and are not in this count. Broken Arrow, Tulsa's largest neighbour, has its own feed and its own pages.

If you work from Bixby, Jenks, Owasso and Sand Springs, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in Tulsa

TradeProjects in the award windowAward window
Elevators leads in Tulsa380% to 20%
Structural Steel leads in Tulsa1000% to 15%
Construction Site Security leads in Tulsa38Before the start to 15%
Concrete and Foundation leads in Tulsa65Before the start to 5%
Masonry leads in Tulsa16010% to 30%
Painting leads in Tulsa2145% to 35%

Every trade in Tulsa: Tulsa construction leads by trade. Every market for framing: Framing construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find framing construction leads in Tulsa?

Start from building permits, not bid boards: most private framing work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Tulsa's permits, keeps the projects still inside the framing award window (101 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should framing contractors contact a builder in Tulsa?

Builtie times framing from the start of construction to about 20%, with the last realistic approach at about 30%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards framing work on new construction in Tulsa?

The builder or general contractor books framing crews while the foundation is going in, often from a short list of crews it already trusts.

How many framing projects does Builtie track in Tulsa?

101 projects were inside the framing award window on October 9, 2026: 25 new buildings and 76 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.