Sales Toolkit for Framing Contractors: Win Work From Builders and GCs

Carpenters framing the wood structure of a new house
Builtie construction intelligence content. Figures read October 9, 2026.

Framing contractors win work from builders and general contractors by reaching them before the framing package is awarded, sending a bid that is easy to compare and following up as the build moves. The window runs from the start of construction to about 20%, with the last realistic approach at about 30%. Builtie, a sales automation platform for construction trades, counted 26,780 framing projects inside that window across 25 markets on October 9, 2026 and finds each builder's decision maker; this toolkit has the timing, copyable bid and follow-up templates, and where the work is.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How framing contractors win work from builders and GCs

  1. Find the projects early, on building permits: most private framing work is awarded by the builder or general contractor without a public bid.
  2. Call inside the window: from the start of construction to about 20%, with the last realistic approach at about 30%.
  3. Reach the person who buys framing work. The builder or general contractor books framing crews while the foundation is going in, often from a short list of crews it already trusts.
  4. Send a bid that is easy to compare: scope, price and validity, exclusions, allowances and a schedule tied to the build.
  5. Follow up when the build moves, not on a timer, and ask for the builder's next project when this one is decided.

When framing work gets picked

Builtie times framing work from the start of construction to about 20%, with the last realistic approach at about 30%. That is early in the build, so the projects to call are the recently permitted ones.

Tap a stage. The highlighted stage is where framing is typically awarded.

The window is a share of the build, so its dates depend on how long the build runs. Builtie's own estimate sets the build length from the declared construction value on the permit; in weeks after construction starts:

Declared valueWindow opensWindow closesLast realistic approach
$250k to $1M (7-month build)the startweek 6week 9
$1M to $5M (13-month build)the startweek 11week 17
$5M to $25M (20-month build)the startweek 17week 26
$25M to $100M (30-month build)the startweek 26week 39

Check one project: the award window calculator takes a trade and a stage (or months since the permit was issued) and says whether framing work is before, inside or past its window.

Bid cover note template

Send this with the price. It answers the questions an estimator asks before comparing bids: what is in, what is out, what is an allowance, and when you can start. Replace everything in [brackets].

Bid cover note: framing
Subject: [Project address]: Framing price from [Your company]

Hi [First name],

Attached is our framing price for [project address], based on [drawings / specification, revision and date].

Scope: wall, floor and roof framing per structural and architectural drawings [sheets].
Price: $[amount] [plus tax], valid until [date].
Excludes: lumber supply unless listed; window and door installation; crane time unless listed.
Allowances: [number] crew weeks; blocking for [items] as listed.
Schedule: Framing work is usually decided from the start of construction to about 20% of the build. We can hold [crew / production slot] for [weeks or dates] if we hear back by [date], and will confirm again when the foundation completion date is set.

Why us: [show crew availability for the exact weeks the foundation will be ready, lumber sourcing and your safety record].

One question: [the one thing that would change the price, such as a spec choice or a phasing date].

[Your name]
[Company] | [phone] | [email]

Three-touch follow-up and a LinkedIn note

Three emails, each tied to the project rather than to a calendar: the first a few days after the bid, the second when the foundation completion date is set, the third before the window closes at about 30% of the build. The LinkedIn note is for the estimator or project manager you have not met.

Touch 1: after the bid
Subject: Re: [Project address]: framing price

Hi [First name],

Checking the framing price for [project address] reached you and reads clearly. If anything in the scope or the exclusions does not match your other bids, tell me and I will line it up so you are comparing like for like.

[Your name] | [phone]
Touch 2: when the build moves
Subject: [Project address]: framing schedule

Hi [First name],

I see [project address] is moving: the foundation completion date is set. That is usually when framing work gets decided. We are still holding [crew / production slot] for [dates]. Can I get 10 minutes this week to confirm the scope, or is there a revision I should price?

[Your name] | [phone]
Touch 3: before the window closes
Subject: [Project address]: releasing our framing slot

Hi [First name],

We will release the [crew / production slot] we held for [project address] on [date] unless you need it. If framing work has been awarded, no problem: what is your next project, and when does it go out to price?

[Your name] | [phone]
LinkedIn connection note
Hi [First name], saw [Company] has [project address] in the works. We do framing work for builders and GCs in [city] and price to your schedule. Worth a look before framing work is awarded? [Your name]

Where framing projects are open now

MarketState or provinceProjects in the award window
New York CityNew York13,097
AustinTexas4,538
Miami-DadeFlorida2,535
CalgaryAlberta1,314
Los AngelesCalifornia1,081
NashvilleTennessee950
ChicagoIllinois785
TorontoOntario474

26,780 framing projects were inside the award window across 25 markets in the United States and Canada on October 9, 2026: 10,802 new buildings and 15,978 renovations or alterations. Every market: framing leads by city.

More for framing contractors

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

How do framing contractors win work from builders and general contractors?

By finding projects early on building permits, reaching the builder or general contractor while the framing package is still open (from the start of construction to about 20%, with the last realistic approach at about 30%), sending a bid that states scope, exclusions, allowances and schedule, and following up as the build moves.

When is framing work awarded on a new building?

Builtie times framing work from the start of construction to about 20%, with the last realistic approach at about 30%. The builder or general contractor books framing crews while the foundation is going in, often from a short list of crews it already trusts.

What should a framing bid cover note include?

The drawings and revision it is based on, the scope (wall, floor and roof framing per structural and architectural drawings [sheets]), the price and how long it holds, what it excludes, the allowances, and a schedule tied to when framing work is decided.

How should I follow up on a framing bid?

Three touches tied to the project: a few days after sending, when the foundation completion date is set, and before the window closes at about 30% of the build. If the package is gone, ask for the builder's next project.

Is Builtie a CRM?

No. A CRM stores the contacts and deals you already have. Builtie is sales automation: it finds the projects from building permits, times each one to your trade's award window, finds the decision maker and runs the LinkedIn and email outreach. Most customers keep their CRM or job-management tool for the work they win.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.