Elevators Construction Leads in San Antonio (2026): 188 Projects in the Award Window

Glazing crew installing curtain wall panels on a commercial building
Live figures read October 9, 2026. Builtie construction intelligence content.

To find elevator construction leads in San Antonio, work from building permits and time the call to the build stage. On October 9, 2026, 188 permitted projects in the City of San Antonio were still at the point where elevator is awarded. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many elevator projects are open in San Antonio right now

MeasureSan Antonio
Projects in the elevator award window188
New buildings / renovations and alterations175 / 13
Permitted in the last 90 days108
Rank among 25 markets for elevator8 of 25
Newest permit in the San Antonio feedOctober 2, 2026

93% of them are new buildings and 7% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. Because elevator is bought early, the 108 projects permitted in the last 90 days are the ones to call first; 57% of the count is that recent. San Antonio ranks 8 of 25 markets Builtie covers for elevator, behind Calgary (208 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when elevator is awarded, and the job is big enough to be worth quoting: at least $60k of elevator work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Elevators: projects in the award window, by market New York City 8,863 Austin 4,450 Miami-Dade 984 Los Angeles 698 Chicago 210 Toronto 208 Calgary 208 San Antonio 188 Vancouver 116 Fort Worth 100

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.

When elevator is awarded, and who decides

Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%. The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.

Tap a stage. The highlighted stage is where elevator is typically awarded.

What to lead with when you call a builder in San Antonio: cab and machine specifications, manufacturing lead time and the maintenance contract that follows the install.

What the San Antonio data covers

The data is San Antonio's own building permits. Neighbouring cities issue their own permits and are not in this count. The permit names a contact person; Builtie resolves the company behind it before a project is shown.

If you work from New Braunfels, Schertz, Boerne and the rest of Bexar County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in San Antonio

TradeProjects in the award windowAward window
Framing leads in San Antonio2630% to 20%
Structural Steel leads in San Antonio2180% to 15%
Construction Site Security leads in San Antonio518Before the start to 15%
Concrete and Foundation leads in San Antonio160Before the start to 5%
Masonry leads in San Antonio41810% to 30%
Painting leads in San Antonio5915% to 35%

Every trade in San Antonio: San Antonio construction leads by trade. Every market for elevator: Elevators construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find elevator construction leads in San Antonio?

Start from building permits, not bid boards: most private elevator work is awarded by the builder or general contractor without a public bid. Builtie reads the City of San Antonio's permits, keeps the projects still inside the elevator award window (188 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should elevator contractors contact a builder in San Antonio?

Builtie times elevator from the start of construction to about 20%, with the last realistic approach at about 30%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards elevator work on new construction in San Antonio?

The developer and general contractor choose the elevator supplier early, because the shaft, pit and machine room are designed around it; an elevator consultant or the architect writes the specification.

How many elevator projects does Builtie track in San Antonio?

188 projects were inside the elevator award window on October 9, 2026: 175 new buildings and 13 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.