Flooring Construction Leads by City (2026): 40,492 Projects in 25 Markets

On October 9, 2026, Builtie counted 40,492 flooring projects still inside the flooring award window across 25 markets in the United States and Canada. New York City leads with 17,434. The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
Open flooring projects in every market Builtie covers
| Market | State or province | Projects in the award window | Permitted in the last 90 days |
|---|---|---|---|
| New York City | New York | 17,434 | 3,891 |
| Austin | Texas | 7,303 | 1,116 |
| Miami-Dade | Florida | 3,802 | 718 |
| Los Angeles | California | 2,376 | 511 |
| Calgary | Alberta | 2,204 | 477 |
| Toronto | Ontario | 1,751 | 207 |
| Nashville | Tennessee | 1,191 | 306 |
| Chicago | Illinois | 1,018 | 202 |
| Seattle | Washington | 625 | 150 |
| Vancouver | British Columbia | 615 | 90 |
| San Antonio | Texas | 413 | 31 |
| Fort Worth | Texas | 339 | 31 |
| Fayetteville, Arkansas | Arkansas | 207 | 31 |
| Kitchener | Ontario | 166 | 41 |
| Airdrie | Alberta | 166 | 44 |
| Overland Park | Kansas | 163 | 24 |
| Little Rock | Arkansas | 160 | 23 |
| Tulsa | Oklahoma | 150 | 23 |
| Grande Prairie | Alberta | 117 | 32 |
| Windsor, Ontario | Ontario | 91 | 9 |
| Thunder Bay | Ontario | 60 | 7 |
| North Little Rock | Arkansas | 55 | 11 |
| Broken Arrow | Oklahoma | 43 | 1 |
| Red Deer | Alberta | 29 | 12 |
| St. Louis | Missouri | 14 |
Across the 25 markets, 40,492 flooring projects were inside the award window on October 9, 2026: 35,293 in the United States and 5,199 in Canada, 8,002 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.
The twelve largest of 25 markets, read October 9, 2026.
When flooring is awarded, and who decides
Builtie times flooring from about 50% of the way through the build to about 70%, with the last realistic approach at about 80%. The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.
Tap a stage. The highlighted stage is where flooring is typically awarded.
What to lead with: samples and product lead times, subfloor preparation and install dates that follow drywall and paint.
Running the pipeline
Flooring work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the selection meeting, product lead times and the install date after drywall and paint in the record. CRM for flooring contractors covers what to look for in a CRM built around that.
More: construction leads for flooring contractors, and every market and trade.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
Where are the most flooring construction leads in North America?
Among the markets Builtie covers, on October 9, 2026: New York City, 17,434 projects; Austin, 7,303 projects; Miami-Dade, 3,802 projects; Los Angeles, 2,376 projects; Calgary, 2,204 projects.
When should flooring contractors contact builders?
Builtie times flooring from about 50% of the way through the build to about 70%, with the last realistic approach at about 80%.
Who decides on flooring for a new building?
The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.
How are these flooring projects counted?
A project counts when its permit was issued in the last four years, the build is still inside the flooring award window and the job is at least $5k of flooring work. Trade sub-permits are grouped into their parent project.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
