Flooring Construction Leads by City (2026): 40,492 Projects in 25 Markets

A long finished corridor with new flooring in a commercial building
Live figures read October 9, 2026. Builtie construction intelligence content.

On October 9, 2026, Builtie counted 40,492 flooring projects still inside the flooring award window across 25 markets in the United States and Canada. New York City leads with 17,434. The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open flooring projects in every market Builtie covers

MarketState or provinceProjects in the award windowPermitted in the last 90 days
New York CityNew York17,4343,891
AustinTexas7,3031,116
Miami-DadeFlorida3,802718
Los AngelesCalifornia2,376511
CalgaryAlberta2,204477
TorontoOntario1,751207
NashvilleTennessee1,191306
ChicagoIllinois1,018202
SeattleWashington625150
VancouverBritish Columbia61590
San AntonioTexas41331
Fort WorthTexas33931
Fayetteville, ArkansasArkansas20731
KitchenerOntario16641
AirdrieAlberta16644
Overland ParkKansas16324
Little RockArkansas16023
TulsaOklahoma15023
Grande PrairieAlberta11732
Windsor, OntarioOntario919
Thunder BayOntario607
North Little RockArkansas5511
Broken ArrowOklahoma431
Red DeerAlberta2912
St. LouisMissouri14

Across the 25 markets, 40,492 flooring projects were inside the award window on October 9, 2026: 35,293 in the United States and 5,199 in Canada, 8,002 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.

Flooring: projects in the award window, by market New York City 17,434 Austin 7,303 Miami-Dade 3,802 Los Angeles 2,376 Calgary 2,204 Toronto 1,751 Nashville 1,191 Chicago 1,018 Seattle 625 Vancouver 615 San Antonio 413 Fort Worth 339

The twelve largest of 25 markets, read October 9, 2026.

When flooring is awarded, and who decides

Builtie times flooring from about 50% of the way through the build to about 70%, with the last realistic approach at about 80%. The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.

Tap a stage. The highlighted stage is where flooring is typically awarded.

What to lead with: samples and product lead times, subfloor preparation and install dates that follow drywall and paint.

Running the pipeline

Flooring work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the selection meeting, product lead times and the install date after drywall and paint in the record. CRM for flooring contractors covers what to look for in a CRM built around that.

More: construction leads for flooring contractors, and every market and trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

Where are the most flooring construction leads in North America?

Among the markets Builtie covers, on October 9, 2026: New York City, 17,434 projects; Austin, 7,303 projects; Miami-Dade, 3,802 projects; Los Angeles, 2,376 projects; Calgary, 2,204 projects.

When should flooring contractors contact builders?

Builtie times flooring from about 50% of the way through the build to about 70%, with the last realistic approach at about 80%.

Who decides on flooring for a new building?

The builder or general contractor awards flooring, but on custom and higher-end work the designer or owner chooses the product first.

How are these flooring projects counted?

A project counts when its permit was issued in the last four years, the build is still inside the flooring award window and the job is at least $5k of flooring work. Trade sub-permits are grouped into their parent project.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.