Industrial Renovation Permits in Vancouver: 93 Permits in Twelve Months

Ironworkers erecting a structural steel frame on a construction site
Figures read October 9, 2026 from Builtie's permit data.

The City of Vancouver issued 93 permits for alterations, expansions and upgrades to industrial buildings from October 2025 to September 2026, 20 of them in the quarter to September. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many industrial renovation permits Vancouver issued

MeasureVancouver
Permits issued, October 2025 to September 202693
July to September 202620
April to June 202625
Share of Vancouver's classified permits3%
Busiest monthNovember 2025 (13)
Rank among 16 markets6 of 16

This counts permits for alterations, expansions and upgrades to industrial buildings that Builtie classifies as industrial renovation. The quarter to September was down 20% on the quarter before.

Industrial Renovation Permits in Vancouver, by month Oct 2025 10 Nov 2025 13 Dec 2025 7 Jan 2026 3 Feb 2026 9 Mar 2026 6 Apr 2026 7 May 2026 11 Jun 2026 7 Jul 2026 9 Aug 2026 6 Sep 2026 5

Permits issued per month, read October 9, 2026 from Builtie's permit data.

Industrial Renovation Permits: permits in twelve months, by market Miami-Dade 1,813 New York City 578 Los Angeles 406 Calgary 182 Nashville 97 Vancouver 93 Chicago 58 Seattle 56 Airdrie 44 Austin 28

The largest markets for industrial renovation, read October 9, 2026.

Who decides on industrial renovation in Vancouver

The owner or the facility manager decides, often with pre-qualified contractors who already know the site.

Trades these projects buy, and how many are open now

Each trade is bought at its own stage of the build. These are the trades industrial renovation projects lean on, with the projects in Vancouver still inside each trade's award window today:

TradeProjects in its award window nowAward window
Electrical73220% to 45%
HVAC and Mechanical73220% to 45%
Fire Protection54925% to 50%
Roofing59415% to 35%
Concrete and Foundation217Before the start to 5%

What the Vancouver data covers

The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.

Other building types in Vancouver: new residential construction, residential renovation, new commercial construction, commercial renovation, institutional renovation.

Month by month: Vancouver construction permits by month. Every trade: Vancouver construction leads by trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

How many industrial renovation permits were issued in Vancouver in the last year?

93 from October 2025 to September 2026, 20 of them from July to September 2026, read October 9, 2026.

Who awards the trades on industrial renovation projects?

The owner or the facility manager decides, often with pre-qualified contractors who already know the site.

How do I find industrial renovation projects in Vancouver before they are awarded?

Work from the building permits: Builtie reads the City of Vancouver's permits, estimates each project's stage and shows the ones still inside your trade's award window, with the builder or general contractor and a verified decision maker.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.