1200 Bayview Gate SW, Airdrie: School

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

School at 1200 Bayview Gate SW, Airdrie was permitted on August 17, 2026 with a stated construction value of $25M to $50M. Base building bayview k-8 school rockyview school division Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1200 Bayview Gate SW, Airdrie
ProjectSchool
Building typeInstitutional
WorkNew building
Permit issuedAugust 17, 2026
Stated construction value$25M to $50M
Estimated stagePermit
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Base building bayview k-8 school rockyview school division”

Which trades are being bought now

The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Airdrie

All of them: major construction projects in Airdrie. The data is Airdrie's own building permits. Neighbouring cities issue their own permits and are not in this count. Airdrie is mostly new subdivisions, so nearly every project counted is a new home. Calgary, next door, has its own feed.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1200 Bayview Gate SW?

School. Base building bayview k-8 school rockyview school division

When was the permit issued for 1200 Bayview Gate SW?

August 17, 2026, by the City of Airdrie.

Who is building 1200 Bayview Gate SW?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1200 Bayview Gate SW need now?

At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.