Construction Leads in Airdrie (2026): Open Projects for Every Trade

Commercial building under construction with a tower crane
Live figures read October 9, 2026. Builtie construction intelligence content.

Airdrie has open projects for 26 trades in Builtie's permit feed. On October 9, 2026 the largest was drywall, with 183 projects still inside its award window. The data is the City of Airdrie's own building permits; Builtie estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open projects in Airdrie, by trade

Each trade is counted separately, because each is bought at a different stage of the build. Trades are listed in the order they are usually awarded, from site work to finishes; the award window is how far through the build that contract is usually decided.

TradeProjects in the award windowPermitted in the last 90 daysAward window
Excavation and Site Work2121Before construction starts
Construction Site Security6037Before the start to 15%
Concrete and Foundation3635Before the start to 5%
Structural Steel59560% to 15%
Elevators1040% to 20%
Framing75640% to 20%
Painting1771225% to 35%
Masonry12610710% to 30%
Waterproofing14011310% to 35%
Roofing14611915% to 35%
Windows, Doors and Glazing14611915% to 35%
Electrical16811320% to 45%
HVAC and Mechanical16811320% to 45%
Plumbing16611120% to 45%
Fire Protection1085325% to 50%
Signage and Wayfinding60825% to 70%
Insulation1588730% to 55%
Drywall1838135% to 60%
Low Voltage and Data1838135% to 60%
Tile1716145% to 65%
Cabinetry and Millwork1664450% to 70%
Flooring1664450% to 70%
Countertops1501855% to 75%
Finish Carpentry1511955% to 75%
Appliances and Equipment125565% to 90%
Landscaping124465% to 90%
Airdrie: projects in each trade's award window Drywall 183 Low Voltage and Data 183 Painting 177 Tile 171 Electrical 168 HVAC and Mechanical 168 Cabinetry and Millwork 166 Flooring 166 Plumbing 166 Insulation 158

The ten trades with the most open projects in Airdrie, read October 9, 2026.

What sells early and what sells late in Airdrie

Early trades (excavation and site work, site security, concrete, structural steel, elevator) need projects permitted recently, before the structure goes up. Late trades (cabinetry, flooring, countertop, finish carpentry, appliance and equipment) are bought from projects permitted a year or more ago that are only now reaching the finishes, so their counts lean on the older permits.

The broadest trade count in Airdrie covers 177 new buildings and 7 renovations or alterations. Most open work is new construction, so builders and developers are the buyers to reach.

What the Airdrie data covers

The data is Airdrie's own building permits. Neighbouring cities issue their own permits and are not in this count. Airdrie is mostly new subdivisions, so nearly every project counted is a new home. Calgary, next door, has its own feed.

See also: construction lead generation software in Alberta, and every market and trade Builtie covers.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Permits issued in Airdrie: Airdrie construction permits by month; the September 2026 report; by building type: new residential construction, residential renovation.

Frequently asked questions

Which trades have the most open construction projects in Airdrie?

On October 9, 2026: drywall, 183 projects; low-voltage, 183 projects; painting, 177 projects; tile, 171 projects; electrical, 168 projects.

Where does Builtie get Airdrie construction leads?

From the City of Airdrie's building permits. Builtie estimates each project's stage, keeps the ones still inside each trade's award window and attaches the builder or general contractor with a verified decision maker.

Does the Airdrie count include nearby cities?

No. It counts the City of Airdrie only. Neighbouring municipalities issue their own permits.

When should I contact a builder in Airdrie?

It depends on the trade. Site work and concrete are bought before or at the start of construction; framing, steel and windows in the first fifth of the build; mechanical, electrical and plumbing at about 20% to 45%; drywall and finishes after that; landscaping and appliances near the end.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.