Roofing Construction Leads in Airdrie (2026): 146 Projects in the Award Window

Roofers installing shingles on a new residential roof deck
Live figures read October 9, 2026. Builtie construction intelligence content.

To find roofing construction leads in Airdrie, work from building permits and time the call to the build stage. On October 9, 2026, 146 permitted projects in the City of Airdrie were still at the point where roofing is awarded. The builder or general contractor awards roofing around framing, before the roof deck is visible from the street. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many roofing projects are open in Airdrie right now

MeasureAirdrie
Projects in the roofing award window146
New buildings / renovations and alterations143 / 3
Permitted in the last 90 days119
Median declared construction value$474,200 (CAD)
Rank among 25 markets for roofing16 of 25
Newest permit in the Airdrie feedOctober 7, 2026

98% of them are new buildings and 2% are renovations, additions or alterations, so most of this work is awarded by builders and developers on ground-up projects. Because roofing is bought early, the 119 projects permitted in the last 90 days are the ones to call first; 82% of the count is that recent. Airdrie ranks 16 of 25 markets Builtie covers for roofing, behind Fayetteville, Arkansas (148 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when roofing is awarded, and the job is big enough to be worth quoting: at least $8k of roofing work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Roofing: projects in the award window, by market New York City 19,395 Austin 7,038 Miami-Dade 3,895 Los Angeles 2,144 Calgary 2,021 Nashville 1,374 Chicago 1,087 Toronto 1,026 Seattle 611 Vancouver 594 Airdrie 146

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets, plus Airdrie.

When roofing is awarded, and who decides

Builtie times roofing from about 15% of the way through the build to about 35%, with the last realistic approach at about 45%. The builder or general contractor awards roofing around framing, before the roof deck is visible from the street.

Tap a stage. The highlighted stage is where roofing is typically awarded.

What to lead with when you call a builder in Airdrie: material availability, crew dates tied to the framing schedule, warranty terms and the building-envelope details.

What the Airdrie data covers

The data is Airdrie's own building permits. Neighbouring cities issue their own permits and are not in this count. Airdrie is mostly new subdivisions, so nearly every project counted is a new home. Calgary, next door, has its own feed.

Trades bought around the same stage in Airdrie

TradeProjects in the award windowAward window
Windows, Doors and Glazing leads in Airdrie14615% to 35%
Waterproofing leads in Airdrie14010% to 35%
Masonry leads in Airdrie12610% to 30%
Painting leads in Airdrie1775% to 35%
Electrical leads in Airdrie16820% to 45%
HVAC and Mechanical leads in Airdrie16820% to 45%

Every trade in Airdrie: Airdrie construction leads by trade. Every market for roofing: Roofing construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find roofing construction leads in Airdrie?

Start from building permits, not bid boards: most private roofing work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Airdrie's permits, keeps the projects still inside the roofing award window (146 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should roofing contractors contact a builder in Airdrie?

Builtie times roofing from about 15% of the way through the build to about 35%, with the last realistic approach at about 45%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards roofing work on new construction in Airdrie?

The builder or general contractor awards roofing around framing, before the roof deck is visible from the street.

How many roofing projects does Builtie track in Airdrie?

146 projects were inside the roofing award window on October 9, 2026: 143 new buildings and 3 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.