100, 960 Hamilton Boulevard NE, Airdrie: Transit Facility

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Transit Facility at 100, 960 Hamilton Boulevard NE, Airdrie was permitted on August 19, 2025 with a stated construction value of $10M to $25M. Base building base building highland park fire station Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address100, 960 Hamilton Boulevard NE, Airdrie
ProjectTransit Facility
Building typeInstitutional
WorkNew building
Permit issuedAugust 19, 2025
Stated construction value$10M to $25M
Estimated stageFraming
Company named on the permitPcl Construction Management
Decision makers and contactsIn Builtie

From the permit: “Base building base building highland park fire station”

Which trades are being bought now

The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Airdrie

All of them: major construction projects in Airdrie. The data is Airdrie's own building permits. Neighbouring cities issue their own permits and are not in this count. Airdrie is mostly new subdivisions, so nearly every project counted is a new home. Calgary, next door, has its own feed.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 100, 960 Hamilton Boulevard NE?

Transit Facility. Base building base building highland park fire station

When was the permit issued for 100, 960 Hamilton Boulevard NE?

August 19, 2025, by the City of Airdrie.

Who is building 100, 960 Hamilton Boulevard NE?

Pcl Construction Management is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 100, 960 Hamilton Boulevard NE need now?

At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.