31 Currie Ln SW, Calgary: Institutional Project

Institutional Project at 31 Currie Ln SW, Calgary was permitted on January 15, 2026 with a stated construction value of $50M to $100M. Advanced Medical & The Academy of the Aged Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 31 Currie Ln SW, Calgary |
| Project | Institutional Project |
| Building type | Institutional |
| Work | New building |
| Permit issued | January 15, 2026 |
| Stated construction value | $50M to $100M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Advanced Medical & The Academy of the Aged”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 1200 Belmont Bv SW: Transit Facility
- 509 14 Av SW: Apartment Building
- 4050 128 Av SE: 4-Storey Retail Building
- 640 5 Av SW: Office-to-Residential Conversion
- 9750 17 Av SW: 2-Storey School
All of them: major construction projects in Calgary. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 31 Currie Ln SW?
Institutional Project. Advanced Medical & The Academy of the Aged
When was the permit issued for 31 Currie Ln SW?
January 15, 2026, by the City of Calgary.
Who is building 31 Currie Ln SW?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 31 Currie Ln SW need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
