31 Currie Ln SW, Calgary: Institutional Project

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Institutional Project at 31 Currie Ln SW, Calgary was permitted on January 15, 2026 with a stated construction value of $50M to $100M. Advanced Medical & The Academy of the Aged Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address31 Currie Ln SW, Calgary
ProjectInstitutional Project
Building typeInstitutional
WorkNew building
Permit issuedJanuary 15, 2026
Stated construction value$50M to $100M
Estimated stageFoundation
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Advanced Medical & The Academy of the Aged”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Calgary

All of them: major construction projects in Calgary. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 31 Currie Ln SW?

Institutional Project. Advanced Medical & The Academy of the Aged

When was the permit issued for 31 Currie Ln SW?

January 15, 2026, by the City of Calgary.

Who is building 31 Currie Ln SW?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 31 Currie Ln SW need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.