370 Thomas St, Seattle: Transit Facility Renovation

Commercial building under construction with a tower crane
Figures read October 15, 2026 from Builtie's permit data.

Transit Facility Renovation at 370 Thomas St, Seattle was permitted on June 29, 2026 with a stated construction value of $10M to $25M. Construct alterations to renovate historic Seattle Center Monorail Station per plan. Mechanical work included this permit Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address370 Thomas St, Seattle
ProjectTransit Facility Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedJune 29, 2026
Stated construction value$10M to $25M
Estimated stageFoundation
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Construct alterations to renovate historic Seattle Center Monorail Station per plan. Mechanical work included this permit”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Seattle

All of them: major construction projects in Seattle. Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 370 Thomas St?

Transit Facility Renovation. Construct alterations to renovate historic Seattle Center Monorail Station per plan. Mechanical work included this permit

When was the permit issued for 370 Thomas St?

June 29, 2026, by the City of Seattle.

Who is building 370 Thomas St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 370 Thomas St need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.