Masonry Construction Leads in Seattle (2026): 523 Projects in the Award Window

Masonry and blockwork rising on an active construction site
Live figures read October 9, 2026. Builtie construction intelligence content.

To find masonry construction leads in Seattle, work from building permits and time the call to the build stage. On October 9, 2026, 523 permitted projects in the City of Seattle were still at the point where masonry is awarded. The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many masonry projects are open in Seattle right now

MeasureSeattle
Projects in the masonry award window523
New buildings / renovations and alterations300 / 223
Permitted in the last 90 days469
Median declared construction value$484,176
Rank among 25 markets for masonry9 of 25
Newest permit in the Seattle feedOctober 7, 2026

57% of them are new buildings and 43% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. Because masonry is bought early, the 469 projects permitted in the last 90 days are the ones to call first; 90% of the count is that recent. Seattle ranks 9 of 25 markets Builtie covers for masonry, behind Toronto (775 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when masonry is awarded, and the job is big enough to be worth quoting: at least $10k of masonry work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Masonry: projects in the award window, by market New York City 16,670 Austin 6,173 Miami-Dade 3,252 Los Angeles 1,838 Calgary 1,693 Nashville 1,160 Chicago 929 Toronto 775 Seattle 523 Vancouver 501

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.

When masonry is awarded, and who decides

Builtie times masonry from about 10% of the way through the build to about 30%, with the last realistic approach at about 40%. The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule.

Tap a stage. The highlighted stage is where masonry is typically awarded.

What to lead with when you call a builder in Seattle: material lead times, crew availability and weather planning for the exterior schedule.

What the Seattle data covers

Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.

If you work from Bellevue, Redmond, Kirkland, Renton, Everett and Tacoma, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in Seattle

TradeProjects in the award windowAward window
Painting leads in Seattle7545% to 35%
Waterproofing leads in Seattle53110% to 35%
Roofing leads in Seattle61115% to 35%
Windows, Doors and Glazing leads in Seattle64415% to 35%
Elevators leads in Seattle400% to 20%
Framing leads in Seattle4110% to 20%

Every trade in Seattle: Seattle construction leads by trade. Every market for masonry: Masonry construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find masonry construction leads in Seattle?

Start from building permits, not bid boards: most private masonry work is awarded by the builder or general contractor without a public bid. Builtie reads the City of Seattle's permits, keeps the projects still inside the masonry award window (523 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should masonry contractors contact a builder in Seattle?

Builtie times masonry from about 10% of the way through the build to about 30%, with the last realistic approach at about 40%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards masonry work on new construction in Seattle?

The builder or general contractor awards masonry early, around the structure, because brick and stone have long lead times and set the exterior schedule.

How many masonry projects does Builtie track in Seattle?

523 projects were inside the masonry award window on October 9, 2026: 300 new buildings and 223 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.