Construction Leads in Seattle by Trade (2026)

Commercial building under construction with a tower crane
Live figures read October 9, 2026. Builtie construction intelligence content.

Seattle has open projects for 26 trades in Builtie's permit feed. On October 9, 2026 the largest was HVAC, with 759 projects still inside its award window. The data is the City of Seattle's own building permits; Builtie estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open projects in Seattle, by trade

Each trade is counted separately, because each is bought at a different stage of the build. Trades are listed in the order they are usually awarded, from site work to finishes; the award window is how far through the build that contract is usually decided.

TradeProjects in the award windowPermitted in the last 90 daysAward window
Excavation and Site Work116115Before construction starts
Construction Site Security383245Before the start to 15%
Concrete and Foundation195193Before the start to 5%
Structural Steel3303140% to 15%
Elevators40190% to 20%
Framing4113820% to 20%
Painting7545555% to 35%
Masonry52346910% to 30%
Waterproofing53144110% to 35%
Roofing61151915% to 35%
Windows, Doors and Glazing64455215% to 35%
Electrical75455520% to 45%
HVAC and Mechanical75956020% to 45%
Plumbing71251320% to 45%
Fire Protection41621825% to 50%
Signage and Wayfinding2635225% to 70%
Insulation58431930% to 55%
Drywall72932735% to 60%
Low Voltage and Data67427235% to 60%
Tile58215545% to 65%
Cabinetry and Millwork57710250% to 70%
Flooring62515050% to 70%
Countertops5704455% to 75%
Finish Carpentry5967055% to 75%
Appliances and Equipment6362865% to 90%
Landscaping6312365% to 90%
Seattle: projects in each trade's award window HVAC and Mechanical 759 Electrical 754 Painting 754 Drywall 729 Plumbing 712 Low Voltage and Data 674 Windows, Doors and Glazing 644 Appliances and Equipment 636 Landscaping 631 Flooring 625

The ten trades with the most open projects in Seattle, read October 9, 2026.

What sells early and what sells late in Seattle

Early trades (excavation and site work, site security, concrete, structural steel, elevator) need projects permitted recently, before the structure goes up. Late trades (cabinetry, flooring, countertop, finish carpentry, appliance and equipment) are bought from projects permitted a year or more ago that are only now reaching the finishes, so their counts lean on the older permits.

The broadest trade count in Seattle covers 407 new buildings and 381 renovations or alterations. Most open work is new construction, so builders and developers are the buyers to reach.

What the Seattle data covers

Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.

Customers who work from Bellevue, Redmond, Kirkland, Renton, Everett and Tacoma are shown this feed as their nearest covered market; those cities' own permits are not counted here.

See also: the Seattle market guide, construction lead software in Seattle, construction lead generation software in Washington, and every market and trade Builtie covers.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Permits issued in Seattle: Seattle construction permits by month; the September 2026 report; by building type: new residential construction, residential renovation, commercial renovation, institutional renovation, industrial renovation.

Frequently asked questions

Which trades have the most open construction projects in Seattle?

On October 9, 2026: HVAC, 759 projects; painting, 754 projects; electrical, 754 projects; drywall, 729 projects; plumbing, 712 projects.

Where does Builtie get Seattle construction leads?

From the City of Seattle's building permits. Builtie estimates each project's stage, keeps the ones still inside each trade's award window and attaches the builder or general contractor with a verified decision maker.

Does the Seattle count include nearby cities?

No. It counts the City of Seattle only. Customers in Bellevue, Redmond, Kirkland, Renton, Everett and Tacoma are shown it as their nearest covered market.

When should I contact a builder in Seattle?

It depends on the trade. Site work and concrete are bought before or at the start of construction; framing, steel and windows in the first fifth of the build; mechanical, electrical and plumbing at about 20% to 45%; drywall and finishes after that; landscaping and appliances near the end.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.