Concrete and Foundation Construction Leads by City (2026): 13,532 Projects in 25 Markets

Crew placing and finishing concrete on a construction site
Live figures read October 9, 2026. Builtie construction intelligence content.

On October 9, 2026, Builtie counted 13,532 concrete projects still inside the concrete award window across 25 markets in the United States and Canada. New York City leads with 6,592. The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

Open concrete projects in every market Builtie covers

MarketState or provinceProjects in the award windowPermitted in the last 90 days
New York CityNew York6,5926,559
AustinTexas2,2822,194
Miami-DadeFlorida1,1931,137
CalgaryAlberta665660
Los AngelesCalifornia642638
NashvilleTennessee553552
ChicagoIllinois389377
VancouverBritish Columbia217204
SeattleWashington195193
San AntonioTexas160125
TorontoOntario127112
Fort WorthTexas10896
TulsaOklahoma6564
KitchenerOntario6262
St. LouisMissouri46
Fayetteville, ArkansasArkansas4038
Overland ParkKansas3636
AirdrieAlberta3635
Thunder BayOntario3434
Grande PrairieAlberta2525
Little RockArkansas2322
North Little RockArkansas1414
Red DeerAlberta1212
Broken ArrowOklahoma99
Windsor, OntarioOntario75

Across the 25 markets, 13,532 concrete projects were inside the award window on October 9, 2026: 12,347 in the United States and 1,185 in Canada, 13,249 of them permitted in the last 90 days. Each market counts its own city's permits only, so a large count says as much about how much a city publishes as about how much it builds.

Concrete and Foundation: projects in the award window, by market New York City 6,592 Austin 2,282 Miami-Dade 1,193 Calgary 665 Los Angeles 642 Nashville 553 Chicago 389 Vancouver 217 Seattle 195 San Antonio 160 Toronto 127 Fort Worth 108

The twelve largest of 25 markets, read October 9, 2026.

When concrete is awarded, and who decides

Builtie times concrete from about 5% before construction starts to about 5%, with the last realistic approach at about 15%. The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule.

Tap a stage. The highlighted stage is where concrete is typically awarded.

What to lead with: pour dates you can hold, pump and formwork capacity, and how you handle inspections in cold or hot weather.

Running the pipeline

Concrete and Foundation work comes in waves that follow the permit record, so the pipeline that wins it starts from projects, not from a contact list. Track each project's stage, call the builder when it enters the window, and keep the expected permit date, the excavation start and every pour date you have quoted in the record. CRM for concrete and foundation contractors covers what to look for in a CRM built around that.

More: construction leads for concrete contractors, and every market and trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

Where are the most concrete construction leads in North America?

Among the markets Builtie covers, on October 9, 2026: New York City, 6,592 projects; Austin, 2,282 projects; Miami-Dade, 1,193 projects; Calgary, 665 projects; Los Angeles, 642 projects.

When should concrete and foundation contractors contact builders?

Builtie times concrete from about 5% before construction starts to about 5%, with the last realistic approach at about 15%.

Who decides on concrete for a new building?

The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule.

How are these concrete projects counted?

A project counts when its permit was issued in the last four years, the build is still inside the concrete award window and the job is at least $15k of concrete work. Trade sub-permits are grouped into their parent project.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.