Concrete and Foundation Construction Leads in Miami-Dade (2026): 1,193 Projects in the Award Window

To find concrete construction leads in Miami-Dade, work from building permits and time the call to the build stage. On October 9, 2026, 1,193 permitted projects in Miami-Dade County were still at the point where concrete is awarded. The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many concrete projects are open in Miami-Dade right now
| Measure | Miami-Dade |
|---|---|
| Projects in the concrete award window | 1,193 |
| New buildings / renovations and alterations | 649 / 544 |
| Permitted in the last 90 days | 1,137 |
| Median declared construction value | $1,012,991 |
| Rank among 25 markets for concrete | 3 of 25 |
| Newest permit in the Miami-Dade feed | October 7, 2026 |
54% of them are new buildings and 46% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. Because concrete is bought early, the 1,137 projects permitted in the last 90 days are the ones to call first; 95% of the count is that recent. Miami-Dade ranks 3 of 25 markets Builtie covers for concrete, behind Austin (2,282 projects).
A project counts when its permit was issued in the last four years, the build is still inside the stage when concrete is awarded, and the job is big enough to be worth quoting: at least $15k of concrete work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.
When concrete is awarded, and who decides
Builtie times concrete from about 5% before construction starts to about 5%, with the last realistic approach at about 15%. The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule.
Tap a stage. The highlighted stage is where concrete is typically awarded.
What to lead with when you call a builder in Miami-Dade: pour dates you can hold, pump and formwork capacity, and how you handle inspections in cold or hot weather.
What the Miami-Dade data covers
The feed is Miami-Dade County's permit system. About four in five permits are for unincorporated Miami-Dade; the rest span more than 30 municipalities, including the City of Miami, Coral Gables, Hialeah and Doral. Cities with their own building departments, such as Miami Beach, route only some permits through the county, so their coverage is partial.
If you work from Fort Lauderdale, Hollywood and Pembroke Pines in Broward County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in Miami-Dade
| Trade | Projects in the award window | Award window |
|---|---|---|
| Construction Site Security leads in Miami-Dade | 1,941 | Before the start to 15% |
| Excavation and Site Work leads in Miami-Dade | 405 | Before construction starts |
| Structural Steel leads in Miami-Dade | 2,004 | 0% to 15% |
| Elevators leads in Miami-Dade | 984 | 0% to 20% |
| Framing leads in Miami-Dade | 2,535 | 0% to 20% |
| Masonry leads in Miami-Dade | 3,252 | 10% to 30% |
Every trade in Miami-Dade: Miami-Dade construction leads by trade. Every market for concrete: Concrete and Foundation construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find concrete construction leads in Miami-Dade?
Start from building permits, not bid boards: most private concrete work is awarded by the builder or general contractor without a public bid. Builtie reads Miami-Dade County's permits, keeps the projects still inside the concrete award window (1,193 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should concrete and foundation contractors contact a builder in Miami-Dade?
Builtie times concrete from about 5% before construction starts to about 5%, with the last realistic approach at about 15%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards concrete work on new construction in Miami-Dade?
The general contractor or builder awards foundations first, usually before or right at permit issue, and mostly to contractors it already trusts with the schedule.
How many concrete projects does Builtie track in Miami-Dade?
1,193 projects were inside the concrete award window on October 9, 2026: 649 new buildings and 544 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
