90 Belfield Rd, Toronto: Office and Tenant Fit-Out

Ironworkers erecting a structural steel frame on a construction site
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 90 Belfield Rd, Toronto was permitted on October 21, 2026 with a stated construction value of $50M to $100M. To construct 10,180 sq.m., 1-storey manufacturing plant addition building B7 to existing 1-storey manufacturing plant, and 1,999 sq.m., 3-storey ancillary office addition building B4A to existing 2-storey office building B4. B4A will have rooftop patio, stair… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address90 Belfield Rd, Toronto
ProjectOffice and Tenant Fit-Out
Building typeIndustrial
WorkRenovation or alteration
Permit issuedOctober 21, 2026
Stated construction value$50M to $100M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “To construct 10,180 sq.m., 1-storey manufacturing plant addition building B7 to existing 1-storey manufacturing plant, and 1,999 sq.m., 3-storey ancillary office addition building B4A to existing 2-storey office building B4. B4A will have rooftop patio, stair…”

Where this project is

  1. Since September 200917 other permits at this address
  2. December 5, 2016Addition or alteration: interior alteration · under $1M
  3. July 31, 2018Addition or alteration: interior alteration · under $1M
  4. July 30, 2020Addition or alteration: roofing · under $1M
  5. April 1, 2022Addition or alteration · under $1M
  6. October 21, 2026Drains and site services · $10M to $25M
  7. October 21, 2026Addition or alteration: Office and Tenant Fit-Out · $50M to $100M (this page)
  8. December 2026Estimated construction start (estimate)
  9. April 2029Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 30 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 90 Belfield Rd?

Office and Tenant Fit-Out. To construct 10,180 sq.m., 1-storey manufacturing plant addition building B7 to existing 1-storey manufacturing plant, and 1,999 sq.m., 3-storey ancillary office addition building B4A to existing 2-storey office building B4. B4A will have rooftop patio, stair…

When was the permit issued for 90 Belfield Rd?

October 21, 2026, by the City of Toronto.

Who is building 90 Belfield Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 90 Belfield Rd need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.