Excavation and Site Work Construction Leads in New York City (2026): 877 Projects in the Award Window

To find excavation and site work construction leads in New York City, work from building permits and time the call to the build stage. On October 9, 2026, 877 permitted projects in New York City were still at the point where excavation and site work is awarded. The general contractor or developer awards excavation and site work first, often before the building permit is issued, because it starts the schedule. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
How many excavation and site work projects are open in New York City right now
| Measure | New York City |
|---|---|
| Projects in the excavation and site work award window | 877 |
| New buildings / renovations and alterations | 816 / 0 |
| Permitted in the last 90 days | 875 |
| Rank among 25 markets for excavation and site work | 1 of 25 |
| Newest permit in the New York City feed | October 7, 2026 |
Only new construction is counted for excavation and site work, because renovations rarely need it. Because excavation and site work is bought early, the 875 projects permitted in the last 90 days are the ones to call first; 100% of the count is that recent. New York City ranks 1 of 25 markets Builtie covers for excavation and site work, ahead of every other market.
A project counts when its permit was issued in the last four years, the build is still inside the stage when excavation and site work is awarded, and the job is big enough to be worth quoting: at least $15k of excavation and site work work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.
Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.
When excavation and site work is awarded, and who decides
Builtie times excavation and site work from about 10% before construction starts to the start of construction, with the last realistic approach at about 10%. The general contractor or developer awards excavation and site work first, often before the building permit is issued, because it starts the schedule.
Tap a stage. The highlighted stage is where excavation and site work is typically awarded.
What to lead with when you call a builder in New York City: equipment availability, soil and shoring experience, and how quickly you can mobilize.
What the New York City data covers
All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
If you work from Jersey City, Hoboken, Newark, Yonkers and Long Island, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.
Trades bought around the same stage in New York City
| Trade | Projects in the award window | Award window |
|---|---|---|
| Concrete and Foundation leads in New York City | 6,592 | Before the start to 5% |
| Construction Site Security leads in New York City | 5,179 | Before the start to 15% |
| Structural Steel leads in New York City | 10,596 | 0% to 15% |
| Elevators leads in New York City | 8,863 | 0% to 20% |
| Framing leads in New York City | 13,097 | 0% to 20% |
| Masonry leads in New York City | 16,670 | 10% to 30% |
Every trade in New York City: New York City construction leads by trade. Every market for excavation and site work: Excavation and Site Work construction leads by city.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.
Frequently asked questions
How do I find excavation and site work construction leads in New York City?
Start from building permits, not bid boards: most private excavation and site work work is awarded by the builder or general contractor without a public bid. Builtie reads New York City's permits, keeps the projects still inside the excavation and site work award window (877 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.
When should excavation and site work contractors contact a builder in New York City?
Builtie times excavation and site work from about 10% before construction starts to the start of construction, with the last realistic approach at about 10%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.
Who awards excavation and site work work on new construction in New York City?
The general contractor or developer awards excavation and site work first, often before the building permit is issued, because it starts the schedule.
How many excavation and site work projects does Builtie track in New York City?
877 projects were inside the excavation and site work award window on October 9, 2026: 816 new buildings and 0 renovations or alterations. The count refreshes hourly.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
