Low Voltage and Data Construction Leads in Miami-Dade (2026): 4,199 Projects in the Award Window

Sparks flying from metal work on a building under construction
Live figures read October 9, 2026. Builtie construction intelligence content.

To find low-voltage construction leads in Miami-Dade, work from building permits and time the call to the build stage. On October 9, 2026, 4,199 permitted projects in Miami-Dade County were still at the point where low-voltage is awarded. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many low-voltage projects are open in Miami-Dade right now

MeasureMiami-Dade
Projects in the low-voltage award window4,199
New buildings / renovations and alterations2,498 / 1,701
Permitted in the last 90 days1,150
Median declared construction value$1,075,669
Rank among 25 markets for low-voltage3 of 25
Newest permit in the Miami-Dade feedOctober 7, 2026

59% of them are new buildings and 41% are renovations, additions or alterations: a mix of ground-up builds, where the builder decides, and renovations, where the owner or designer often does. 1,150 of them (27%) were permitted in the last 90 days. Miami-Dade ranks 3 of 25 markets Builtie covers for low-voltage, behind Austin (8,354 projects).

A project counts when its permit was issued in the last four years, the build is still inside the stage when low-voltage is awarded, and the job is big enough to be worth quoting: at least $4k of low-voltage work. Trade sub-permits are grouped into their parent project, so this is a count of projects, not permits.

Low Voltage and Data: projects in the award window, by market New York City 19,986 Austin 8,354 Miami-Dade 4,199 Los Angeles 2,367 Calgary 2,317 Toronto 1,502 Nashville 1,288 Chicago 1,091 Seattle 674 Vancouver 650

Read October 9, 2026 from Builtie's permit data: the ten largest of 25 markets.

When low-voltage is awarded, and who decides

Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.

Tap a stage. The highlighted stage is where low-voltage is typically awarded.

What to lead with when you call a builder in Miami-Dade: structured cabling, security and access-control integration, and coordination with the electrical rough-in.

What the Miami-Dade data covers

The feed is Miami-Dade County's permit system. About four in five permits are for unincorporated Miami-Dade; the rest span more than 30 municipalities, including the City of Miami, Coral Gables, Hialeah and Doral. Cities with their own building departments, such as Miami Beach, route only some permits through the county, so their coverage is partial.

If you work from Fort Lauderdale, Hollywood and Pembroke Pines in Broward County, Builtie shows you this feed as your nearest covered market; those cities' own permits are not in the count above.

Trades bought around the same stage in Miami-Dade

TradeProjects in the award windowAward window
Drywall leads in Miami-Dade4,49635% to 60%
Signage and Wayfinding leads in Miami-Dade3,63725% to 70%
Insulation leads in Miami-Dade3,74130% to 55%
Tile leads in Miami-Dade3,61545% to 65%
Fire Protection leads in Miami-Dade3,34725% to 50%
Cabinetry and Millwork leads in Miami-Dade3,54950% to 70%

Every trade in Miami-Dade: Miami-Dade construction leads by trade. Every market for low-voltage: Low Voltage and Data construction leads by city.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Builtie's deepest coverage is in the Greater Toronto Area, where it started; depth in any city depends on what that municipality publishes. Ask for live sample projects in your own service area before you buy.

Frequently asked questions

How do I find low-voltage construction leads in Miami-Dade?

Start from building permits, not bid boards: most private low-voltage work is awarded by the builder or general contractor without a public bid. Builtie reads Miami-Dade County's permits, keeps the projects still inside the low-voltage award window (4,199 on October 9, 2026) and attaches the builder or general contractor with a verified decision maker.

When should low-voltage and data contractors contact a builder in Miami-Dade?

Builtie times low-voltage from about 35% of the way through the build to about 60%, with the last realistic approach at about 70%. After that the package is usually awarded, and the project is better used as an introduction for the builder's next job.

Who awards low-voltage work on new construction in Miami-Dade?

The general contractor or the electrical contractor awards low-voltage cabling; on commercial work the tenant's or owner's IT lead often specifies it.

How many low-voltage projects does Builtie track in Miami-Dade?

4,199 projects were inside the low-voltage award window on October 9, 2026: 2,498 new buildings and 1,701 renovations or alterations. The count refreshes hourly.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.