New Residential Construction in New York City: 9,816 Permits in Twelve Months

Newly built homes under construction on a residential street
Figures read October 9, 2026 from Builtie's permit data.

New York City issued 9,816 permits for new houses, townhouses and apartment buildings from October 2025 to September 2026, 4,265 of them in the quarter to September. Builtie reads the permits, estimates each project's stage and attaches the builder or general contractor with a verified decision maker.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

How many new residential construction permits New York City issued

MeasureNew York City
Permits issued, October 2025 to September 20269,816
July to September 20264,265
April to June 20263,701
Share of New York City's classified permits15%
Busiest monthMarch 2026 (1,818)
Rank among 23 markets2 of 23

This counts permits for new houses, townhouses and apartment buildings that Builtie classifies as new residential construction. The quarter to September was up 15% on the quarter before. New York City issues a separate permit for each trade on a job, so these are permits, and one project can account for several of them.

New Residential Construction in New York City, by month Oct 2025 0 Nov 2025 0 Dec 2025 0 Jan 2026 0 Feb 2026 32 Mar 2026 1,818 Apr 2026 1,201 May 2026 1,118 Jun 2026 1,382 Jul 2026 1,392 Aug 2026 1,430 Sep 2026 1,443

Permits issued per month, read October 9, 2026 from Builtie's permit data.

New Residential Construction: permits in twelve months, by market Austin 13,153 New York City 9,816 Miami-Dade 7,072 Calgary 6,083 Los Angeles 4,747 Nashville 3,351 Seattle 1,300 Vancouver 895 Fayetteville 872 Chicago 573

The largest markets for new residential construction, read October 9, 2026.

Who decides on new residential construction in New York City

On new homes and apartment buildings the builder or developer awards the trades, through its purchasing manager or site superintendent; on custom homes the owner and designer have a say.

Trades these projects buy, and how many are open now

Each trade is bought at its own stage of the build. These are the trades new residential construction projects lean on, with the projects in New York City still inside each trade's award window today:

TradeProjects in its award window nowAward window
Framing13,0970% to 20%
Concrete and Foundation6,592Before the start to 5%
Roofing19,39515% to 35%
Windows, Doors and Glazing20,30715% to 35%
Plumbing23,03720% to 45%
Electrical24,50520% to 45%
HVAC and Mechanical24,67220% to 45%
Drywall21,10235% to 60%
Cabinetry and Millwork16,57050% to 70%
Flooring17,43450% to 70%

What the New York City data covers

All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Other building types in New York City: residential renovation, new commercial construction, commercial renovation, new institutional construction, institutional renovation, industrial renovation.

Month by month: New York City construction permits by month. Every trade: New York City construction leads by trade.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

How many new residential construction permits were issued in New York City in the last year?

9,816 from October 2025 to September 2026, 4,265 of them from July to September 2026, read October 9, 2026. New York City issues a separate permit for each trade on a job, so these are permits, and one project can account for several of them.

Who awards the trades on new residential construction projects?

On new homes and apartment buildings the builder or developer awards the trades, through its purchasing manager or site superintendent; on custom homes the owner and designer have a say.

How do I find new residential construction projects in New York City before they are awarded?

Work from the building permits: Builtie reads New York City's permits, estimates each project's stage and shows the ones still inside your trade's award window, with the builder or general contractor and a verified decision maker.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.