1 Terminal Dr, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1 Terminal Dr, Nashville was permitted on April 7, 2025 with a stated construction value of $5M to $10M. Tenant renovation at Airport IAF terminal and Concourse B on the ramp level to include new back of house offices, locker and break rooms for airline and to construct a temporary trash dock and NEW electrical transformer connection. POC: Thaddeus Dukes… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1 Terminal Dr, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 7, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Tenant renovation at Airport IAF terminal and Concourse B on the ramp level to include new back of house offices, locker and break rooms for airline and to construct a temporary trash dock and NEW electrical transformer connection. POC: Thaddeus Dukes…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 201 Platform Way N: Office and Tenant Fit-Out
- 2885 Elm Hill Pike: School Renovation
- 25 Lindsley Ave: Retail Building
- 1686 Reynolds Rd: Warehouse Renovation
- 160 2nd Ave S: Apartment Building Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1 Terminal Dr?
Office and Tenant Fit-Out. Tenant renovation at Airport IAF terminal and Concourse B on the ramp level to include new back of house offices, locker and break rooms for airline and to construct a temporary trash dock and NEW electrical transformer connection. POC: Thaddeus Dukes…
When was the permit issued for 1 Terminal Dr?
April 7, 2025, by Metro Nashville and Davidson County.
Who is building 1 Terminal Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1 Terminal Dr need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
