10 San Romanoway, Toronto: Apartment Building Renovation

Apartment Building Renovation at 10 San Romanoway, Toronto was permitted on May 15, 2026 with a stated construction value of $1M to $5M. Balcony guard/railing replacement and associated localized concrete repairs to balcony slab edges/soffits and sealant replacement. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 10 San Romanoway, Toronto |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | May 15, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Seaforth Building Group |
| Decision makers and contacts | In Builtie |
From the permit: “Balcony guard/railing replacement and associated localized concrete repairs to balcony slab edges/soffits and sealant replacement”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1 Richmond St W: Office and Tenant Fit-Out
- 690 Carlaw Ave: School Renovation
- 77 Bloor St W: Office and Tenant Fit-Out
- 271 Front St E: Transit Facility
- 40 Asquith Ave: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 10 San Romanoway?
Apartment Building Renovation. Balcony guard/railing replacement and associated localized concrete repairs to balcony slab edges/soffits and sealant replacement
When was the permit issued for 10 San Romanoway?
May 15, 2026, by the City of Toronto.
Who is building 10 San Romanoway?
Seaforth Building Group is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 10 San Romanoway need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
