100 King St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 100 King St W, Toronto was permitted on March 2, 2026 with a stated construction value of $1M to $5M. Proposal for interior alteration to the ground floor and concourse levels of the building in order to install electronic turnstiles. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 King St W, Toronto |
| Neighbourhood | Yonge-Bay Corridor |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | March 2, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Build It |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior alteration to the ground floor and concourse levels of the building in order to install electronic turnstiles”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 222 Bay St: Office and Tenant Fit-Out
- 40 Temperance St: Office and Tenant Fit-Out
- 761 Bay St: Parking Structure Renovation
- 220 Yonge St: Office and Tenant Fit-Out
- 150 York St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 King St W?
Office and Tenant Fit-Out. Proposal for interior alteration to the ground floor and concourse levels of the building in order to install electronic turnstiles
When was the permit issued for 100 King St W?
March 2, 2026, by the City of Toronto.
Who is building 100 King St W?
Build It is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 100 King St W need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.