100 Yonge St, Toronto: Residential Project Renovation

Residential Project Renovation at 100 Yonge St, Toronto was permitted on July 23, 2026 with a stated construction value of under $1M. Proposal for upgrade existing fire alarm panel. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 100 Yonge St, Toronto |
| Project | Residential Project Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | July 23, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for upgrade existing fire alarm panel”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 200056 other permits at this address
- August 2, 2005Addition or alteration: interior alteration · under $1M
- August 3, 2017Addition or alteration: demolition · under $1M
- March 3, 2020Addition or alteration: interior alteration · under $1M
- November 3, 2022Addition or alteration: interior alteration · under $1M
- November 3, 2022Addition or alteration: interior alteration · under $1M
- July 23, 2026Fire and life safety: Residential Project Renovation · under $1M (this page)
- August 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
- 81 Bay StAddition or alteration: interior alteration · $25M to $50M · December 2025
68 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 7 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Feb 2027 | Estimate |
| Construction Site Security | Aug 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Aug 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Sep 2026 | Window passed (est.) |
| Framing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Roofing | Sep 2026 – Oct 2026 | Approach now |
| Windows, Doors and Glazing | Aug 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 130 Wolseley St: Apartment Building Renovation
- 604 Bay St: Transit Facility Renovation
- 18 Preston Rd: Residential Project Renovation
- 1880-1890 Eglinton Ave E: Office and Tenant Fit-Out
- 11 Rochdale Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 100 Yonge St?
Residential Project Renovation. Proposal for upgrade existing fire alarm panel
When was the permit issued for 100 Yonge St?
July 23, 2026, by the City of Toronto.
Who is building 100 Yonge St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 100 Yonge St need now?
Estimated as of October 2026, the trades to approach now are painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, elevator, framing, masonry and waterproofing.