1001 The Queensway, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1001 The Queensway, Toronto was permitted on November 25, 2025 with a stated construction value of $1M to $5M. Proposal for interior alterations to existing retail unit - shoppers Drug Mart. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1001 The Queensway, Toronto |
| Neighbourhood | Etobicoke City Centre |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | November 25, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | RioCan Living |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior alterations to existing retail unit - shoppers Drug Mart”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 54 Atomic Ave: Industrial Building Renovation
- 1615 The Queensway: Utility Facility Renovation
- 3699 Bloor St W: Transit Facility Renovation
- 185 The West Mall: Office and Tenant Fit-Out
- 78 Advance Rd: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1001 The Queensway?
Office and Tenant Fit-Out. Proposal for interior alterations to existing retail unit - shoppers Drug Mart
When was the permit issued for 1001 The Queensway?
November 25, 2025, by the City of Toronto.
Who is building 1001 The Queensway?
RioCan Living is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1001 The Queensway need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
