101 N Wacker Dr, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 101 N Wacker Dr, Chicago was permitted on January 21, 2026 with a stated construction value of $1M to $5M. Self-cert 2019 cbc: interior alteration of existing offices on the 19th and 20th floors, suites 1950 and 2000. areas of work total 31,462 sq ft. no change to group b occupancy type or construction type i-a. 1st floor retail space was removed from this permit… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 101 N Wacker Dr, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | January 21, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Self-cert 2019 cbc: interior alteration of existing offices on the 19th and 20th floors, suites 1950 and 2000. areas of work total 31,462 sq ft. no change to group b occupancy type or construction type i-a. 1st floor retail space was removed from this permit…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1935 N Mohawk St: 4-Storey Residential Project
- 4241 W Washington Blvd: 2-Storey Place of Worship Renovation
- 2970 N Sheridan Rd: 15-Storey Apartment Building Renovation
- 10406 S Maryland Ave: Townhomes Renovation
- 116 S Michigan Ave: Office and Tenant Fit-Out
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 101 N Wacker Dr?
Office and Tenant Fit-Out. Self-cert 2019 cbc: interior alteration of existing offices on the 19th and 20th floors, suites 1950 and 2000. areas of work total 31,462 sq ft. no change to group b occupancy type or construction type i-a. 1st floor retail space was removed from this permit…
When was the permit issued for 101 N Wacker Dr?
January 21, 2026, by the City of Chicago.
Who is building 101 N Wacker Dr?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 101 N Wacker Dr need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
