1090 Don Mills Rd, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 1090 Don Mills Rd, Toronto was permitted on September 4, 2025 with a stated construction value of under $1M. Office Suite interior fitout for "Wynford" modifications to corridor, demising walls and suite doors, and associated mechanical plumbing and electrical - Unit 301. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1090 Don Mills Rd, Toronto
NeighbourhoodBanbury-Don Mills
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedSeptember 4, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Office Suite interior fitout for "Wynford" modifications to corridor, demising walls and suite doors, and associated mechanical plumbing and electrical - Unit 301”

Where this project is

  1. Since June 2003111 other permits at this address
  2. May 3, 2016Addition or alteration: fire protection · under $1M
  3. May 13, 2016Addition or alteration: facade work · under $1M
  4. June 10, 2016Addition or alteration: demolition · $1M to $5M
  5. August 25, 2017Addition or alteration: demolition · $1M to $5M
  6. May 15, 2024Addition or alteration · under $1M
  7. September 4, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  8. October 2025Estimated construction start (estimate)
  9. April 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 1165 Leslie StAddition or alteration: interior alteration · $1M to $5M · May 2026
  • 900 Don Mills RdAddition or alteration: interior alteration · $1M to $5M · July 2026

3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–2, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Oct 2025 – Apr 2026Estimate
Fire ProtectionOct 2025 – Dec 2025Window passed (est.)
Signage and WayfindingDec 2025 – Jan 2026Window passed (est.)
InsulationNov 2025 – Dec 2025Window passed (est.)
DrywallNov 2025 – Dec 2025Window passed (est.)
Low Voltage and DataNov 2025 – Dec 2025Window passed (est.)
TileNov 2025 – Jan 2026Window passed (est.)
Cabinetry and MillworkNov 2025 – Dec 2025Window passed (est.)
FlooringNov 2025 – Jan 2026Window passed (est.)
CountertopsNov 2025 – Jan 2026Window passed (est.)
Finish CarpentryNov 2025 – Jan 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (October 2025) to the estimated completion (April 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1090 Don Mills Rd?

Office and Tenant Fit-Out. Office Suite interior fitout for "Wynford" modifications to corridor, demising walls and suite doors, and associated mechanical plumbing and electrical - Unit 301

When was the permit issued for 1090 Don Mills Rd?

September 4, 2025, by the City of Toronto.

Who is building 1090 Don Mills Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1090 Don Mills Rd need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.