110 Doon Rd, Kitchener: School Renovation

School Renovation at 110 Doon Rd, Kitchener was permitted on April 30, 2026 with a stated construction value of $1M to $5M. Secondary School (High School, Junior High School) - Permit is for interior alterations to the north wing for Rockway Mennonite Collegiate School. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 110 Doon Rd, Kitchener |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 30, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Secondary School (High School, Junior High School) - Permit is for interior alterations to the north wing for Rockway Mennonite Collegiate School”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Kitchener
- 1111 Westmount Rd E: Office and Tenant Fit-Out
- 255 Fischer Hallman Rd: School Renovation
- 133 Vanier Dr: Townhomes
- 130 Mt Hope St: Apartment Building Renovation
- 1955 Fischer Hallman Rd: Institutional Project Renovation
All of them: construction projects in Kitchener by address. The data is Kitchener's own building permits. Neighbouring cities issue their own permits and are not in this count. Waterloo and Cambridge issue their own permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 110 Doon Rd?
School Renovation. Secondary School (High School, Junior High School) - Permit is for interior alterations to the north wing for Rockway Mennonite Collegiate School
When was the permit issued for 110 Doon Rd?
April 30, 2026, by the City of Kitchener.
Who is building 110 Doon Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 110 Doon Rd need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
