111 Broadway 300, Nashville: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 111 Broadway 300, Nashville was permitted on September 23, 2026 with a stated construction value of $1M to $5M. To conduct general renovations for new tenant; PRISON ISLAND (commercial amusement) escape room, indoor recreation. 3rd floor level. No change to exterior building/roof lines or footprint. DTC, MDHA, HPR, UZO. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 111 Broadway 300, Nashville |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 23, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct general renovations for new tenant; PRISON ISLAND (commercial amusement) escape room, indoor recreation. 3rd floor level. No change to exterior building/roof lines or footprint. DTC, MDHA, HPR, UZO”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 1000 Division St: Restaurant Renovation
- 2311 Gallatin Pike N: Office and Tenant Fit-Out
- 4004 Lebanon Pike: Place of Worship Renovation
- 2220 C Pierce Ave: Healthcare Building Renovation
- 1100 Porter St: Hotel Renovation
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 111 Broadway 300?
Office and Tenant Fit-Out. To conduct general renovations for new tenant; PRISON ISLAND (commercial amusement) escape room, indoor recreation. 3rd floor level. No change to exterior building/roof lines or footprint. DTC, MDHA, HPR, UZO
When was the permit issued for 111 Broadway 300?
September 23, 2026, by Metro Nashville and Davidson County.
Who is building 111 Broadway 300?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 111 Broadway 300 need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
