1135 Roland St, Thunder Bay: School Renovation

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

School Renovation at 1135 Roland St, Thunder Bay was permitted on February 13, 2025 with a stated construction value of $1M to $5M. Other Post-secondary Institution - Alterations for Sheet Metal Workers Training Centre. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1135 Roland St, Thunder Bay
ProjectSchool Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedFebruary 13, 2025
Stated construction value$1M to $5M
Estimated stageMechanical
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Other Post-secondary Institution - Alterations for Sheet Metal Workers Training Centre”

Which trades are being bought now

The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Painting5% to 35%
Electrical20% to 45%
HVAC and Mechanical20% to 45%
Plumbing20% to 45%
Fire Protection25% to 50%
Signage and Wayfinding25% to 70%
Insulation30% to 55%
Drywall35% to 60%
Low Voltage and Data35% to 60%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Thunder Bay

All of them: construction projects in Thunder Bay by address. The data is Thunder Bay's own building permits. Neighbouring cities issue their own permits and are not in this count.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1135 Roland St?

School Renovation. Other Post-secondary Institution - Alterations for Sheet Metal Workers Training Centre

When was the permit issued for 1135 Roland St?

February 13, 2025, by the City of Thunder Bay.

Who is building 1135 Roland St?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1135 Roland St need now?

At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.