115 Milner Ave, Toronto: Industrial Building Renovation

Ironworkers erecting a structural steel frame on a construction site
Figures read October 25, 2026 from Builtie's permit data.

Industrial Building Renovation at 115 Milner Ave, Toronto was permitted on October 15, 2026 with a stated construction value of under $1M. Proposed sprinkler System Upgrade and Relocation of Exit door. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address115 Milner Ave, Toronto
ProjectIndustrial Building Renovation
Building typeIndustrial
WorkRenovation or alteration
Permit issuedOctober 15, 2026
Stated construction valueunder $1M
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed sprinkler System Upgrade and Relocation of Exit door”

Where this project is

  1. October 15, 2026Addition or alteration: Industrial Building Renovation ยท under $1M (this page)
  2. November 2026Estimated construction start (estimate)
  3. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 115 Milner Ave?

Industrial Building Renovation. Proposed sprinkler System Upgrade and Relocation of Exit door

When was the permit issued for 115 Milner Ave?

October 15, 2026, by the City of Toronto.

Who is building 115 Milner Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 115 Milner Ave need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.