1175 E Pump Station Rd, Fayetteville, Arkansas: Warehouse

Warehouse at 1175 E Pump Station Rd, Fayetteville, Arkansas was permitted on January 28, 2025 with a stated construction value of $5M to $10M. New Construction of 60000sf Warehouse Building for Givingtons. Building will be PEMB with structural steel mezzanine. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1175 E Pump Station Rd, Fayetteville, Arkansas |
| Project | Warehouse |
| Building type | Commercial |
| Work | New building |
| Permit issued | January 28, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “New Construction of 60000sf Warehouse Building for Givingtons. Building will be PEMB with structural steel mezzanine”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Fayetteville
- 241 W Spring St: 3-Storey Apartment Building
- 3581 W Mount Comfort Rd: Apartment Building
- 1788 N Starr Dr: Place of Worship
- 2888 N Mansfield Ave: 3-Storey Apartment Building
- 1084 W Mossback Way: 3-Storey Apartment Building
All of them: construction projects in Fayetteville by address. The data is Fayetteville's own building permits. Neighbouring cities issue their own permits and are not in this count. Fayetteville's permit system lists the contractor company and its people on each permit, so the builder is read from the record rather than researched. Springdale, Rogers and Bentonville are not in the feed.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1175 E Pump Station Rd?
Warehouse. New Construction of 60000sf Warehouse Building for Givingtons. Building will be PEMB with structural steel mezzanine
When was the permit issued for 1175 E Pump Station Rd?
January 28, 2025, by the City of Fayetteville.
Who is building 1175 E Pump Station Rd?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1175 E Pump Station Rd need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
