118 Yorkville Ave, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 118 Yorkville Ave, Toronto was permitted on July 30, 2025 with a stated construction value of $1M to $5M. Proposal for interior alterations at P2 level to retrofit for a new restaurant within an existing private mini-cinema. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 118 Yorkville Ave, Toronto |
| Neighbourhood | Annex |
| Project | Office and Tenant Fit-Out |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | July 30, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for interior alterations at P2 level to retrofit for a new restaurant within an existing private mini-cinema”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 500 Dupont St: Restaurant Renovation
- 83 Yorkville Ave: Retail Building Renovation
- 138 Pears Ave: Apartment Building Renovation
- 175 Cumberland St: Apartment Building Renovation
- 102 Yorkville Ave: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 118 Yorkville Ave?
Office and Tenant Fit-Out. Proposal for interior alterations at P2 level to retrofit for a new restaurant within an existing private mini-cinema
When was the permit issued for 118 Yorkville Ave?
July 30, 2025, by the City of Toronto.
Who is building 118 Yorkville Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 118 Yorkville Ave need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
