12 R Strachan Ave, Toronto: Transit Facility

Transit Facility at 12 R Strachan Ave, Toronto was permitted on October 9, 2025 with a stated construction value of $1M to $5M. Proposal for New Step Up Sub Station Unoccupied Industrial Building 400 sqm in area for the Ontario Line. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 12 R Strachan Ave, Toronto |
| Neighbourhood | Fort York-Liberty Village |
| Project | Transit Facility |
| Building type | Industrial |
| Work | New building |
| Permit issued | October 9, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for New Step Up Sub Station Unoccupied Industrial Building 400 sqm in area for the Ontario Line”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 209 Fort York Blvd: Apartment Building Renovation
- 650 Queens Quay: Apartment Building Renovation
- 150 East Liberty St: Apartment Building Renovation
- 40 Hanna Ave: Office and Tenant Fit-Out
- 1 Atlantic Ave: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 12 R Strachan Ave?
Transit Facility. Proposal for New Step Up Sub Station Unoccupied Industrial Building 400 sqm in area for the Ontario Line
When was the permit issued for 12 R Strachan Ave?
October 9, 2025, by the City of Toronto.
Who is building 12 R Strachan Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 12 R Strachan Ave need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
