120 Airpark Ctr E, Nashville: Warehouse Renovation

Warehouse Renovation at 120 Airpark Ctr E, Nashville was permitted on June 17, 2025 with a stated construction value of $5M to $10M. To construct addition to existing non-residential building for tenant: STRICTLY FX (warehouse). Must comply with 17.12.020C, IWD (Industrial warehouse/distribution): Max. FAR: 0.80, Max. ISR 0.90, 5’ min. street setback, 20’ min. rear setback, Max. Height at… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 120 Airpark Ctr E, Nashville |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 17, 2025 |
| Stated construction value | $5M to $10M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To construct addition to existing non-residential building for tenant: STRICTLY FX (warehouse). Must comply with 17.12.020C, IWD (Industrial warehouse/distribution): Max. FAR: 0.80, Max. ISR 0.90, 5’ min. street setback, 20’ min. rear setback, Max. Height at…”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 811 Royal Pkwy: School Renovation
- 1536 Gallatin Pike N: Retail Building Renovation
- 2126 Abbott Martin Rd: Office and Tenant Fit-Out
- 990 Signal Xing: Restaurant Renovation
- 332 Homestead Rd: Warehouse
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 120 Airpark Ctr E?
Warehouse Renovation. To construct addition to existing non-residential building for tenant: STRICTLY FX (warehouse). Must comply with 17.12.020C, IWD (Industrial warehouse/distribution): Max. FAR: 0.80, Max. ISR 0.90, 5’ min. street setback, 20’ min. rear setback, Max. Height at…
When was the permit issued for 120 Airpark Ctr E?
June 17, 2025, by Metro Nashville and Davidson County.
Who is building 120 Airpark Ctr E?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 120 Airpark Ctr E need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
