1207 King St W, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1207 King St W, Toronto was permitted on September 22, 2025 with a stated construction value of $1M to $5M. Proposal to retrofit of interior suite partitions, new washrooms, new stair, hvac modifications to suit new layout. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1207 King St W, Toronto |
| Neighbourhood | South Parkdale |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 22, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal to retrofit of interior suite partitions, new washrooms, new stair, hvac modifications to suit new layout”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 7 Laxton Ave: Apartment Building
- 1100 King St W: Commercial Project Renovation
- 33 Fraser Ave: Office and Tenant Fit-Out
- 1521 Queen St W: 8-Storey Mixed-Use Building
- 1 Civic Centre Crt: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1207 King St W?
Office and Tenant Fit-Out. Proposal to retrofit of interior suite partitions, new washrooms, new stair, hvac modifications to suit new layout
When was the permit issued for 1207 King St W?
September 22, 2025, by the City of Toronto.
Who is building 1207 King St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1207 King St W need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.