121 Industry St, Toronto: Transit Facility Renovation

Transit Facility Renovation at 121 Industry St, Toronto was permitted on May 23, 2025 with a stated construction value of $25M to $50M. Add 17 HVC-150 EV Chargers (68 Charge Points) & 2 Natural Gas Generators to support TTC's eBus Electrification Program.Note: There are two Site Plan Control Applications for this site:- (closed file)- 2004 203174 WET 12 SA (minor revisions under review). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 121 Industry St, Toronto |
| Neighbourhood | Beechborough-Greenbrook |
| Project | Transit Facility Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 23, 2025 |
| Stated construction value | $25M to $50M |
| Estimated stage | Framing |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Add 17 HVC-150 EV Chargers (68 Charge Points) & 2 Natural Gas Generators to support TTC's eBus Electrification Program.Note: There are two Site Plan Control Applications for this site:- (closed file)- 2004 203174 WET 12 SA (minor revisions under review)”
Which trades are being bought now
The project is with the structure going up. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 150 College St: Campus Building Renovation
- 100 Consilium Pl: Office and Tenant Fit-Out
- 1625 Military Trl: 8-Storey Apartment Building Renovation
- 385 Carlingview Dr: Industrial Building Renovation
- 81 Bay St: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 121 Industry St?
Transit Facility Renovation. Add 17 HVC-150 EV Chargers (68 Charge Points) & 2 Natural Gas Generators to support TTC's eBus Electrification Program.Note: There are two Site Plan Control Applications for this site:- (closed file)- 2004 203174 WET 12 SA (minor revisions under review)
When was the permit issued for 121 Industry St?
May 23, 2025, by the City of Toronto.
Who is building 121 Industry St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 121 Industry St need now?
At its current stage: site security, painting, masonry, waterproofing, roofing, window, door and glazing, electrical, HVAC.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
