127 Athens Way, Nashville: Warehouse Renovation

Warehouse Renovation at 127 Athens Way, Nashville was permitted on October 9, 2026 with a stated construction value of $1M to $5M. To conduct renovations to install of conveyor system for fedex. no change to footprint. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 127 Athens Way, Nashville |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | October 9, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “To conduct renovations to install of conveyor system for fedex. no change to footprint”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 335 24th Ave N: Office and Tenant Fit-Out
- 5706 Nolensville Pike: Retail Building Renovation
- 1600 Division St: Office and Tenant Fit-Out
- 201 25th Ave S: Office and Tenant Fit-Out
- 2816 B Dickerson Pike: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 127 Athens Way?
Warehouse Renovation. To conduct renovations to install of conveyor system for fedex. no change to footprint
When was the permit issued for 127 Athens Way?
October 9, 2026, by Metro Nashville and Davidson County.
Who is building 127 Athens Way?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 127 Athens Way need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
