130 E Randolph St, Chicago: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 130 E Randolph St, Chicago was permitted on June 24, 2026 with a stated construction value of $5M to $10M. Self cert 2019 cbrc: interior alterations to existing 15th floor office space suite 1500. (b-business. 1a construction). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 130 E Randolph St, Chicago |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | June 24, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Self cert 2019 cbrc: interior alterations to existing 15th floor office space suite 1500. (b-business. 1a construction)”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Chicago
- 1101 W Argyle St: 5-Storey Mixed-Use Building
- 118 S Clinton St: 7-Storey Office-to-Residential Conversion
- 1210 W 59th St: Office and Tenant Fit-Out
- 150 N Michigan Ave: Office and Tenant Fit-Out
- 1904 W Adams St: 2-Storey Mixed-Use Building
All of them: construction projects in Chicago by address. Chicago issues one combined permit per project, so the name on it is usually the general contractor or developer, which is the company a trade wants to reach.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 130 E Randolph St?
Office and Tenant Fit-Out. Self cert 2019 cbrc: interior alterations to existing 15th floor office space suite 1500. (b-business. 1a construction)
When was the permit issued for 130 E Randolph St?
June 24, 2026, by the City of Chicago.
Who is building 130 E Randolph St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 130 E Randolph St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
