130 Elizabeth St, Toronto: Apartment Building Renovation

Apartment Building Renovation at 130 Elizabeth St, Toronto was permitted on January 30, 2026 with a stated construction value of $5M to $10M. Proposal for Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed apartments. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 130 Elizabeth St, Toronto |
| Neighbourhood | Yonge-Bay Corridor |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | January 30, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Proposal for Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed apartments”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 130 Queen St W: Transit Facility
- 121 King St W: Office and Tenant Fit-Out
- 1 Dundas St W: Office and Tenant Fit-Out
- 1 University Ave: Office and Tenant Fit-Out
- 181 University Ave: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Markham and the rest of the GTA issue their own permits and are not in the feed today, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 130 Elizabeth St?
Apartment Building Renovation. Proposal for Stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed apartments
When was the permit issued for 130 Elizabeth St?
January 30, 2026, by the City of Toronto.
Who is building 130 Elizabeth St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 130 Elizabeth St need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
