135 Overlea Blvd, Toronto: School Renovation

School Renovation at 135 Overlea Blvd, Toronto was permitted on April 16, 2026 with a stated construction value of under $1M. Proposal for interior alterations inside school. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 135 Overlea Blvd, Toronto |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | April 16, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Servocraft Limited |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for interior alterations inside school”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since September 20045 other permits at this address
- April 24, 2007Portable Classrooms
- August 26, 2008Portable Classrooms
- April 20, 2011Mechanical
- November 24, 2017Designated Structures: roofing · under $1M
- February 4, 2026Portable Classrooms · under $1M
- April 16, 2026Addition or alteration: School Renovation · under $1M (this page)
- April 2026Estimated construction start (estimate)
- November 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 703 Don Mills RdAddition or alteration: interior alteration · $1M to $5M · May 2026
- 7 St Dennis DrMechanical · $1M to $5M · February 2026
- 770 Don Mills RdDrains and site services · $1M to $5M · November 2025
- 49 Thorncliffe Park DrMechanical: roofing · $1M to $5M · July 2026
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Nov 2026 | Estimate |
| Fire Protection | May 2026 – Jul 2026 | Window passed (est.) |
| Signage and Wayfinding | Jul 2026 – Sep 2026 | Window passed (est.) |
| Insulation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Drywall | Jun 2026 – Jul 2026 | Window passed (est.) |
| Low Voltage and Data | Jun 2026 – Jul 2026 | Window passed (est.) |
| Tile | Jun 2026 – Aug 2026 | Window passed (est.) |
| Cabinetry and Millwork | Jun 2026 – Jul 2026 | Window passed (est.) |
| Flooring | Jun 2026 – Aug 2026 | Window passed (est.) |
| Countertops | Jun 2026 – Aug 2026 | Window passed (est.) |
| Finish Carpentry | Jun 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 2937 Eglinton Ave E: Transit Facility Renovation
- 3908 Bloor St W: Office and Tenant Fit-Out
- 2322 Bloor St W: Office and Tenant Fit-Out
- 5633-5639 Finch Ave E: Institutional Project Renovation
- 125 Chatsworth Dr: School Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 135 Overlea Blvd?
School Renovation. Proposal for interior alterations inside school
When was the permit issued for 135 Overlea Blvd?
April 16, 2026, by the City of Toronto.
Who is building 135 Overlea Blvd?
Servocraft Limited is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 135 Overlea Blvd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.