135 Railside Rd, Toronto: Office and Tenant Fit-Out

Ironworkers erecting a structural steel frame on a construction site
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 135 Railside Rd, Toronto was permitted on November 6, 2025 with a stated construction value of under $1M. Proposed new sunken entrance to replace existing with accesible ramp. New LU/LA elevator, 2nd floor renovation of existing office space. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address135 Railside Rd, Toronto
NeighbourhoodVictoria Village
ProjectOffice and Tenant Fit-Out
Building typeIndustrial
WorkRenovation or alteration
Permit issuedNovember 6, 2025
Stated construction valueunder $1M
Estimated stageFraming
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed new sunken entrance to replace existing with accesible ramp. New LU/LA elevator, 2nd floor renovation of existing office space”

Where this project is

  1. November 6, 2025Addition or alteration: Office and Tenant Fit-Out ยท under $1M (this page)
  2. November 6, 2025Plumbing
  3. November 6, 2025Mechanical
  4. November 6, 2025Drains and site services: elevator
  5. December 2025Estimated construction start (estimate)
  6. June 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Jun 2026Estimate
Construction Site SecurityNov 2025 – Jan 2026Window passed (est.)
PaintingDec 2025 – Feb 2026Window passed (est.)
MasonryDec 2025 – Jan 2026Window passed (est.)
WaterproofingDec 2025 – Jan 2026Window passed (est.)
RoofingDec 2025 – Jan 2026Window passed (est.)
Windows, Doors and GlazingDec 2025 – Jan 2026Window passed (est.)
ElectricalJan 2026 – Feb 2026Window passed (est.)
HVAC and MechanicalJan 2026 – Feb 2026Window passed (est.)
PlumbingDec 2025 – Feb 2026Window passed (est.)
Fire ProtectionJan 2026 – Feb 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 135 Railside Rd?

Office and Tenant Fit-Out. Proposed new sunken entrance to replace existing with accesible ramp. New LU/LA elevator, 2nd floor renovation of existing office space

When was the permit issued for 135 Railside Rd?

November 6, 2025, by the City of Toronto.

Who is building 135 Railside Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 135 Railside Rd need now?

Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.