1402 Dickerson Pike, Nashville: Commercial Project Renovation

Commercial Project Renovation at 1402 Dickerson Pike, Nashville was permitted on September 28, 2026 with a stated construction value of $1M to $5M. EXISTING 9,000SF COMMERCIAL SPACE IS BEING RENOVATED TO RECONFIGURE THE LAYOUT FOR BIG PRETTY MOON FITNESS. MINOR EXTERIOR UPGRADES WILL BE PROVIDED TO THE BUILDING. THE EXISTING BUILDING IS UNSPRINKLERED. no change to footprint. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1402 Dickerson Pike, Nashville |
| Project | Commercial Project Renovation |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | September 28, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Permit |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “EXISTING 9,000SF COMMERCIAL SPACE IS BEING RENOVATED TO RECONFIGURE THE LAYOUT FOR BIG PRETTY MOON FITNESS. MINOR EXTERIOR UPGRADES WILL BE PROVIDED TO THE BUILDING. THE EXISTING BUILDING IS UNSPRINKLERED. no change to footprint”
Which trades are being bought now
The project is just permitted; site work and foundations come next. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Nashville
- 111 4th Ave S: Restaurant Renovation
- 1220 Martin St: Office and Tenant Fit-Out
- 2100 Charlotte Ave: Office and Tenant Fit-Out
- 2201 Murphy Ave: Office and Tenant Fit-Out
- 2725 Old Lebanon Pike: Office and Tenant Fit-Out
All of them: construction projects in Nashville by address. The feed is Metro Nashville and Davidson County. It states a construction cost on almost every permit, so project size is reliable here.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1402 Dickerson Pike?
Commercial Project Renovation. EXISTING 9,000SF COMMERCIAL SPACE IS BEING RENOVATED TO RECONFIGURE THE LAYOUT FOR BIG PRETTY MOON FITNESS. MINOR EXTERIOR UPGRADES WILL BE PROVIDED TO THE BUILDING. THE EXISTING BUILDING IS UNSPRINKLERED. no change to footprint
When was the permit issued for 1402 Dickerson Pike?
September 28, 2026, by Metro Nashville and Davidson County.
Who is building 1402 Dickerson Pike?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 1402 Dickerson Pike need now?
At its current stage: excavation and site work, site security, concrete, structural steel, elevator, framing, painting.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
